Ares I-X 2009 Test Flight Progress: Pyrotechnic Stage Separation

[/caption]

The successful test of NASA’s Ares I-X Forward Skirt Extension on Thursday represents a “major milestone” in the development of the launch system, according to Alliant Techsystems (ATK). The “skirt extension” in question is a solid ring of aluminium (or aluminum) connecting the first stage with the upper stages of the rocket.

This summer, the first flight of the Constellation Program is scheduled to blast off from a Cape Canaveral launch pad. The ATK pyrotechnics deep in the Utah Desert has proven to NASA that a key portion of this test flight will go as planned, allowing the reusable portion of the Ares I to return to Earth for recovery…

To say 2008 was a turbulent year for the Constellation program is an understatement. Although there have been a number of successful tests (including the test firing of the jettison motor, launch abort system and an old Shuttle engine; plus parachute tests), political tensions, criticism of the technology and budget uncertainty have all taken their toll. The future of the Constellation Program is in doubt (or shaky at best) and there’s not many media headlines with anything positive to say. So, when there is a successful test of any Ares component, it is certainly worth reporting, in an attempt to redress the good-news/bad-news balance and give credit where credit is due.

Artist impression of the Ares I-X at the launchpad, plus labelled sections of the rocket (NASA)
So, last week, ATK successfully tested the explosive charges that will perform the most important task of the test launch of the Ares I-X. The Forward Skirt Extension is located between the first and second stages of the rocket (pictured left). This 1.8 metre (6 ft) long by 3.7 metre (12 ft) diameter aluminium cylinder will allow the first stage booster to separate at the frustum (a cone-shaped connector that attaches the first stage to the larger diameter upper stage). During the launch, separation will occur at an altitude of around 40 km (130,000 ft).

This section will also be important as it will need to store the recovery parachutes for the first stage and it will need to support the mass of the upper stages (plus payload) during launch. It is for this reason that the skirt is forged from one solid lump of aluminium and reinforced with a unique internal support structure, housing three main parachutes.

Data from the charge detonation will be used to measure the shock generated, understanding how this might affect the Ares I-X mission and future Ares I launches. Thursday’s test appears to have achieved this as well as severing the forward skirt extension.

Roll on summer, I’m looking forward to seeing the Ares X-I first stage parachute to Earth

Source: NASA

Ian O'Neill

[Follow me on Twitter (@astroengine)] [Check out my space blog: Astroengine.com] [Check out my radio show: Astroengine Live!] Hello! My name is Ian O'Neill and I've been writing for the Universe Today since December 2007. I am a solar physics doctor, but my space interests are wide-ranging. Since becoming a science writer I have been drawn to the more extreme astrophysics concepts (like black hole dynamics), high energy physics (getting excited about the LHC!) and general space colonization efforts. I am also heavily involved with the Mars Homestead project (run by the Mars Foundation), an international organization to advance our settlement concepts on Mars. I also run my own space physics blog: Astroengine.com, be sure to check it out!

Recent Posts

A New Study Suggests How we Could Find Advanced Civilizations that Ran Out of Fusion Fuel

When it comes to our modern society and the many crises we face, there is…

3 hours ago

We Might Finally Know How Galaxies Grow So Large

Astronomers have spent decades trying to understand how galaxies grow so large. One piece of…

7 hours ago

Building Concrete on Mars From Local Materials

Imagine you've just gotten to Mars as part of the first contingent of settlers. Your…

9 hours ago

New Research Indicates the Sun may be More Prone to Flares Than we Thought

This past year saw some significant solar activity. This was especially true during the month…

1 day ago

NASA’s Perseverance Rover Reaches the Top Rim of the Jezero Crater

In 2018, NASA mission planners selected the Jezero Crater as the future landing site of…

2 days ago

Antimatter Propulsion Is Still Far Away, But It Could Change Everything

Getting places in space quickly has been the goal of propulsion research for a long…

3 days ago