It appears that the Russian government wants to take action over the string of unmanned mission failures beleaguering Roscosmos, or the Russian Federal Space Agency. A recent example includes the loss in June of three GLONASS navigation/positioning satellites in a launch failure. In 2011, Roscosmos lost four major missions, including the Phobos-Grunt spacecraft that was bound for the Martian moon Phobos.
RIA Novosti reports that Dmitry Rogozin, Russia’s deputy prime minister, plans to create a new state entity to take over space manufacturing. The proposed United Rocket and Space Corporation, the report says, will reduce the reliance on imported parts to get missions off the ground, among other aims.
“A new state corporation will be created to take over manufacturing facilities from the Federal Space Agency, whose prestige has been severely dented in recent years by a string of failed rocket launches,” the report says. “The proposed United Rocket and Space Corporation will enable the trimming away of redundant departments replicated elsewhere in the space industry.”
As for Roscosmos itself, the report hints that other changes could be on the way. Its envisioned role is to “act as a federal executive body and contracting authority for programs to be implemented by the industry.” There are expected to be changes in management, among other measures.
The agency was formed after the breakup of the Soviet Union in 1991 and is responsible for most of Russia’s space activities. Russia’s heritage in space actually stretches back to the dawn of the space age in the 1950s and 1960s, when the country became the first nation to launch a satellite (Sputnik) and a human (Yuri Gagarin), among other milestones.
Trajectory Map of Juno’s Earth Flyby on Oct. 9, 2013
The Earth gravity assist is required to accelerate Juno’s arrival at Jupiter on July 4, 2016 and will capture an unprecedented movie of the Earth/Moon system. Credit: NASA/JPL
Details on how to watch via Slooh – see below [/caption]
NASA’s solar powered Jupiter-bound Juno orbiter is careening towards Earth for an absolutely critical gravity assisted fly by speed boost while capturing an unprecedented movie view of the Earth/Moon system – on its ultimate quest to unveiling Jupiter’s genesis!
“Juno will flyby Earth on October 9 to get a gravity boost and increase its speed in orbit around the Sun so that it can reach Jupiter on July 4, 2016,” Juno chief scientist Dr. Scott Bolton told Universe Today in an exclusive new Juno mission update – as the clock is ticking to zero hour. “The closest approach is over South Africa.”
All this ‘high frontier’ action comes amidst the utterly chaotic US government partial shutdown, that threatened the launch of the MAVEN Mars orbiter, has halted activity on many other NASA projects and stopped public announcements of the safe arrival of NASA’s LADEE lunar orbiter on Oct. 6, Juno’s flyby and virtually everything else related to NASA!
Bolton confirmed that the shutdown fortunately hasn’t altered or killed Juno’s flyby objectives. And ops teams at prime contractor Lockheed Martin have rehearsed and all set.
And some more good news is that Slooh will track the Juno Earth Flyby “LIVE” – for those hoping to follow along. Complete details below!
“The shutdown hasn’t affected our operations or plans, Bolton told me. Bolton is Juno’s principal investigator from the Southwest Research Institute (SwRI), San Antonio, Texas.
“Juno is 100% healthy.”
“But NASA is unable to participate in our public affairs and press activities,” Bolton elaborated.
97% of NASA’s employees are furloughed – including public affairs – due to the legal requirements of the shutdown!
Juno will also capture an unprecedented new movie of the Earth/Moon system.
A full up science investigation of our Home Planet by Juno is planned, that will also serve as a key test of the spacecraft and its bevy of state of the art instruments.
“During the earth flyby we have most of our instruments on and will obtain a unique movie of the Earth Moon system on our approach.
“We will also calibrate instuments and measure earth’s magnetosphere, obtain closeup images of the Earth and the Moon in UV [ultraviolet] and IR [infrared],” Bolton explained to Universe Today.
The flyby will accelerate the spacecraft’s velocity by 16,330 mph.
Where is the best view of Juno’s flyby, I asked?
“The closest approach is over South Africa and is about 500 kilometers [350 miles],” Bolton replied.
The time of closest approach is 3:21 p.m. EDT (12:21 PDT / 19:21 UTC) on Oct. 9, 2013
Watch this mission produced video about Juno and the Earth flyby:
Video caption: On Oct. 9, 2013, NASA’s Jupiter-bound Juno spacecraft is making a quick pass to get a gravity boost from the mother planet. Dr. Scott Bolton of Southwest Research Institute® is the Juno mission principal investigator, leading an international science team seeking to answer some fundamental questions about the gas giant and, in turn, about the processes that led to formation of our solar system.
NASA’s Juno spacecraft blasted off atop an Atlas V rocket two years ago from Cape Canaveral Air Force Station, FL, on Aug. 5, 2011 to begin a 2.8 billion kilometer science trek to discover the genesis of Jupiter hidden deep inside the planet’s interior.
Juno is on a 5 year and 1.7 Billion mile (2.8 Billion km) trek to the largest planet in our solar system. When it arrives at Jupiter on July 4, 2016, Juno will become the first polar orbiting spacecraft at the gas giant.
During a one year science mission – entailing 33 orbits lasting 11 days each – the probe will plunge to within about 3000 miles of the turbulent cloud tops and collect unprecedented new data that will unveil the hidden inner secrets of Jupiter’s genesis and evolution.
The goal is to find out more about the planets origins, interior structure and atmosphere, observe the aurora, map the intense magnetic field and investigate the existence of a solid planetary core
Why does Juno need a speed boost from Earth?
“A direct mission to Jupiter would have required about 50 percent more fuel than we loaded,” said Tim Gasparrini, Juno program manager for Lockheed Martin Space Systems, in a statement.
“Had we not chosen to do the flyby, the mission would have required a bigger launch vehicle, a larger spacecraft and would have been more expensive.”
Viewers near Cape Town, South Africa will have the best opportunity to view the spacecraft traveling across the sky.
Juno itself will most likely not be visible to the unaided eye, but binoculars or a small telescope with a wide field should provide an opportunity to view, according to a Slooh statement.
Slooh will track Juno live on October 9th, 2013.
Check here for international starting times: http://goo.gl/7ducFs – and for the Slooh broadcast hosted by Paul Cox.
Viewers can view the event live on Slooh.com using their computer or mobile device, or by downloading the free Slooh iPad app in the iTunes store. Questions can be asked during the broadcast via Twitter by using the hashtag #nasajuno -says Slooh.
Amidst the government shutdown, Juno prime contractor Lockheed Martin is working diligently to ensure the mission success.
Because there are NO 2nd chances!
“The team is 100 percent focused on executing the Earth flyby successfully,” said Gasparrini.
“We’ve spent a lot of time looking at possible off-nominal conditions. In the presence of a fault, the spacecraft will stay healthy and will perform as planned.”
Stay tuned here for continuing Juno, LADEE, MAVEN and more up-to-date NASA news.
And be sure to check back here for my post-flyby update.
What’s not at all clear is whether Juno will detect any signs of ‘intelligent life’ in Washington D.C.!
Learn more about Juno, LADEE, MAVEN, Curiosity, Mars rovers, Cygnus, Antares, SpaceX, Orion, the Gov’t shutdown and more at Ken’s upcoming presentations
Oct 8: “NASA’s Historic LADEE Lunar & Antares/Cygnus ISS Rocket Launches from Virginia”& “Curiosity, MAVEN, Juno and Orion updates”; Princeton University, Amateur Astronomers Assoc of Princeton (AAAP), Princeton, NJ, 8 PM
NASA’s LADEE lunar orbiter will fire its main engine on Oct. 6 to enter lunar orbit in the midst of the US government shutdown. Credit: NASA
See the orbit insertion animation below[/caption]
Update Oct 6: LADEE fired its main engine this morning (Oct. 6) at 6:57 a.m. EDT and successfully achieved lunar orbit. Headline/story revised.
NASA’s trailblazing LADEE lunar spacecraft is set to ignite its main engine and enter lunar orbit on Sunday morning, Oct. 6 – if all goes well – following the spectacular Sept. 6 night launch from NASA’s Virginia spaceport.
And in a happenstance no one could have foreseen, the critical engine firing comes smack in the midst of the political chaos reigning in Washington D.C. that has shut down the US government, furloughed 97% of NASA’s employees, and temporarily threatened the upcoming launch of NASA’s next mission to Mars – the MAVEN orbiter.
But there will be virtually a complete news blackout and little public information released due to the legal requirements of the shutdown.
NASA websites, which are amongst the most heavily trafficked, as well as NASA TV have been shuttered during the shutdown and the press office is likewise furloughed.
So it was do or die for LADEE with the four minute long braking thruster firing set to start on Oct. 6 at 6:57 a.m. EDT (10:57 UTC), so that the couch sized spacecraft is captured by the Moon’s gravity.
Fortunately, LADEE was deemed “essential” and a small team of engineers is working right now at mission control at NASA’s Ames Research Center in California.
If the had burn failed, LADEE will swing by the moon with no hope of returning. And this is being accomplished with a skeleton crew thanks to the government shutdown.
Here’s a video animation of orbital capture at the moon:
Video caption: This video shows the LADEE lunar orbit capture scheduled to take place at 10:57 UTC on 6 Oct. 2013. The main view is an Earth centered perspective showing the effect of the Moon’s gravity on the orbit and then how a Lunar orbit looks from the Earth. The inset view shows the same trajectory from the perspective of the Moon.
Dubbed LOI-1 (Lunar Orbit Insertion burn 1),it is designed to begin with LADEE’s arrival at the Moon after three and a half orbits of the Earth. It will change the spacecrafts velocity by 329.8 meters/sec.
LOI-1 is the first of three main engine maneuvers and will place LADEE into a 24 hour retrograde orbit, with a periselene altitude of 590 km (369 mi).
LOI-2 follows on Oct. 9 to place LADEE into a 4 hour orbit with a 250 km (156 mi) periselene altitude.
Finally LOI-3 on Oct. 12 places LADEE into a roughly circular 250 km (156 mi) orbit that initiates a 30 day commissioning phase as well as experiments using the on-board Lunar Laser Communications Experiment (LLCD) before the start of the missions science phase.
LADEE thundered to space atop the maiden launch of the five stage Minotaur V rocket on Sept. 6, blazing a spectacular trail to orbit from a beachside launch pad at NASA’s Wallops Flight Facility in Virginia.
The blastoff was easily visible to tens of millions of thrilled spectators up and down the eastern seaboard stretching from Maine to the Carolinas as a result of crystal clear skies and the night time liftoff.
The LADEE liftoff at 11:27 p.m. EDT marked the first space probe of any kind ever launched beyond Earth orbit from NASA Wallops, as well as being the first planetary science mission ever launched from Wallops.
Eventually the spacecraft will fly in a very low equatorial science orbit of about 50 kilometers (31 mi) altitude above the moon that will require considerable fuel to maintain. The science mission duration is approximately 100 days, limited by the amount of maneuvering fuel.
The 844 pound (383 kg) robot explorer was assembled at NASA’s Ames Research Center, Moffett Field, Calif., and is a cooperative project with NASA Goddard Spaceflight Center in Maryland.
It is equipped with a trio of science instruments whose purpose is to collect data that will inform scientists in unprecedented detail about the ultra thin lunar atmosphere, environmental influences on lunar dust and conditions near the surface.
The goal of the $280 Million mission is to gain a thorough understanding of long-standing unknowns about the tenuous atmosphere, dust and surface interactions that will help scientists understand other planetary bodies as well.
The probe is built on a revolutionary ‘modular common spacecraft bus’, or body, that could dramatically cut the cost of exploring space and also be utilized on space probes to explore a wide variety of inviting targets in the solar system.
“LADEE is the first in a new class of interplanetary exploration missions,” NASA Ames Director Pete Worden told Universe Today in an interview. “It will study the pristine moon to study significant questions.”
“This is probably our last best chance to study the pristine Moon before there is a lot of human activity there changing things.”
Technicians resumed spacecraft preparations for NASA’s MAVEN orbiter today (Oct. 3) aimed towards meeting the hoped for Nov. 18 launch to Mars after receiving an ‘emergency exemption’ from forced furloughs. The Oct. 1 US Government shutdown had stopped all work on MAVEN and various other NASA missions. Credit: Ken Kremer/kenkremer.com Story updated[/caption]
Following a three day period of complete work stoppage due to the US Government Shutdown, technicians late today (Oct. 3) resumed critical launch preparations for NASA’s next mission to Mars, the MAVEN orbiter. And it’s not a moment too soon, because the consequences of a continued suspension would have been absolutely dire for the entire future of Mars exploration!
“We have already restarted spacecraft processing at the Kennedy Space Center (KSC) today,” Prof. Bruce Jakosky, MAVEN’s chief scientist told Universe Today in a special new mission update today.
Today, Oct 3, top NASA managers have “determined that MAVEN meets the requirements allowing an emergency exception relative to the Anti-Deficiency Act,” Jakosky told me.
MAVEN had been scheduled to blast off for the Red Planet on Nov.18 atop an Atlas V rocket from the Florida Space Coast until those plans were derailed by the start of the government shutdown that began at midnight, Tuesday (Oct. 1) due to senseless and endless political gridlock in Washington, DC.
About 97% of NASA’s workforce had been immediately furloughed on Oct. 1 and ordered not to go to work – along with some 800,000 other Federal employees – when their work was deemed “non-essential” despite maintaining spacecraft valued at tens of billions of dollars.
This left only skeleton crews manning Mission Control’s for dozens and dozens of ongoing space missions and the International Space Station (ISS)
Despite the work hiatus, the team is still hoping to achieve an on time launch or soon thereafter.
“We are working toward being ready to launch on Nov. 18,” Jakosky told me, as MAVEN’s principal Investigator of the University of Colorado at Boulder.
“We will continue to work over the next couple of days to identify any changes in our schedule or plans that are necessary to stay on track.”
How realistic is the original Nov. 18 launch date, I asked?
“We think it’s very feasible,” Jakosky responded.
“With our having been shut down for only a few days, we should be back on track toward this date quickly.”
The processing team at KSC lost three days of the nine days of margin in the schedule.
Where does the team pick up with work?
“With the facility now back up and running, we more or less pick up right where we left off,” Jakosky explained
“We are reworking the schedule to make sure our activities are integrated together and that people don’t have to be in two places at once.”
The nominal launch window for NASA’s $650 Million MAVEN (Mars Atmosphere and Volatile EvolutioN Mission) mission to study the Red Planet’s atmosphere only extends about three weeks until Dec. 7.
And he said the team will do whatever necessary, including overtime, to launch MAVEN to the Red Planet by Dec. 7.
“The team is committed to getting to the launch pad at this opportunity, and is willing to work double shifts and seven days a week if necessary. That plus the existing margin gives us some flexibility. “
Interestingly, the ‘’emergency exemption” was granted because of MAVEN’s additional secondary role as a communications relay for NASA’s intrepid pair of surface rovers – Curiosity and Opportunity – and not because of its primary science mission.
“MAVEN is required as a communications relay in order to be assured of continued communications with the Curiosity and Opportunity rovers,” Jakosky explained.
Although NASA has two functioning orbiters circling the Red Planet at this moment, they are getting old, are far beyond their original design lifetimes and suffer occasional glitches. And there is no guarantee of continued operation.
“The rovers are presently supported by Mars Odyssey launched in 2001 and Mars Reconnaissance Orbiter launched in 2005.”
“Launching MAVEN in 2013 protects the existing assets that are at Mars today,” Jakosky told me.
If Mars Odyssey and/or Mars Reconnaissance Orbiter were to fail, then the rovers mission operations would be severely curtailed and could even be terminated prematurely – in a worst case scenario.
And without MAVEN, there would be no point in launching NASA’s planned 2020 rover since there would be no way to transmit the science data back to Earth.
“There is no NASA relay orbiter at Mars planned post-MAVEN,” Jakosky noted.
If MAVEN has to launch later in December 2013 or is forced to be postponed to the next launch window opportunity in 2016, both the communications relay capability and the missions atmospheric science objectives would have been very badly impacted.
“A delay in the launch date by more than a week past the end of the nominal launch period, or a delay of launch to 2016, would require additional fuel to get into orbit.”
“This would have precluded having sufficient fuel for MAVEN to carry out its science mission and to operate as a relay for any significant time,” Jakosky elaborated.
“Our nominal launch period runs from 18 November through 7 December, and we can launch as late as about 15 December without a significant impact on our combined science and relay activities.”
From a purely science standpoint, 2013 is the best time to launch MAVEN to accomplish its science objectives.
“Although the exception for MAVEN is not being done for science reasons, the science of MAVEN clearly will benefit from this action.”
“Launching in 2013 allows us to observe at a good time in the eleven-year solar cycle.”
“MAVENS’s goal is determining the composition of the ancient Martian atmosphere and when it was lost, where did all the water go and how and when was it lost,” said Jakosky.
Stay tuned here for continuing MAVEN and government shutdown updates.
And watch for my articles about critical operations related to LADEE on Oct 6 and JUNO on Oct. 9. The government shutdown negatively impacts these missions and others as well.
“Talk about a selfie!” wrote former astronaut Clay Anderson on Twitter yesterday (Oct. 1). He posted that comment along with a favorite photo from Expedition 15, when he was standing in restraints on the robotic Canadarm2. Off in the distance, he saw his shadow against the solar array panels of a Soyuz spacecraft.
That got us thinking — what are the best astronaut selfies? Below are some of our favourites (some intentional, some not) from over the years. Any that we have missed? Let us know in the comments!
Once-active “supervolcanoes” in northern Mars likely spewed ash and dust thousands of miles away, producing powdery deposits noticed by the NASA’s Curiosity and Opportunity rovers closer to the equator, a new study suggests.
The scientists suspect that irregularly shaped craters in Arabia Terra, which is in the northern highlands of Mars, are leftovers of huge volcanoes from eons ago. Until now, those areas weren’t pegged as volcanoes at all.
“Discovering supervolcanic structures fundamentally changes how we view ancient volcanism on Mars,” stated Joseph Michalski, a Mars researcher at the Natural History Museum in London and the Planetary Institute in Tucson, Arizona.
“Many Martian volcanoes are easily recognized from their massive shield-shaped structure, similar to what we see in Hawaii. But these are relatively youthful features on Mars, and we have always wondered where the ancient volcanoes are. It is possible that the most ancient volcanoes were much more explosive and formed structures similar to what we now see in Arabia Terra.”
As some scientists believe that the crust of Mars was thinner than it is now, this would let magma erupt to the surface before it could release gases inside the crust, the team added. The finding also has implications for predicting the ancient atmosphere and looking at habitability.
“If future work shows that supervolcanoes were present more widely on ancient Mars, it would completely change estimates of how the atmosphere formed from volcanic gases, how sediments formed from volcanic ash and how
habitable the surface might have been,” Michalski added.
Be sure to check out the full paper in Nature. Author affiliations include the Planetary Science Institute in Arizona, the London Natural History Museum, and the NASA Goddard Space Flight Center.
The upcoming Nov. 18 blastoff of NASA’s new MAVEN Mars orbiter is threatened by today’s US Federal Government shutdown. Launch processing work has now ceased! Spacecraft preps had been in full swing when MAVEN was unveiled to the media, including Universe Today, inside the clean room at the Kennedy Space Center on Sept. 27, 2013. With solar panels unfurled, this is exactly how MAVEN looks when flying through interplanetary space and orbiting Mars.
Credit: Ken Kremer/kenkremer.com[/caption]
KENNEDY SPACE CENTER, FL – The upcoming Nov. 18 blastoff of NASA’s next mission to Mars – the “breathtakingly beautiful” MAVEN orbiter – is threatened by today’s (Oct. 1) shutdown of the US Federal Government. And the team is very “concerned”, although not yet “panicked.”
MAVEN’s on time launch is endangered by the endless political infighting in Washington DC. And the bitter gridlock could cost taxpayers tens of millions of dollars or more on this mission alone!
Why? Because launch preparations at NASA’s Kennedy Space Center (KSC) have ceased today when workers were ordered to stay home, said the missions top scientist in an exclusive to Universe Today.
“MAVEN is shut down right now!” Prof. Bruce Jakosky, MAVEN’s principal Investigator, of the University of Colorado at Boulder, told Universe Today in an exclusive post shutdown update today.
“Which means that civil servants and work at government facilities [including KSC] have been undergoing an orderly shutdown,” Jakosky told me.
The nominal interplanetary launch window for NASA’s $650 Million MAVEN (Mars Atmosphere and Volatile EvolutioN Mission) mission to study the Red Planet’s upper atmosphere only extends about three weeks until Dec. 7.
If MAVEN misses the window of opportunity this year, liftoff atop the Atlas V rocket would have to be postponed until early 2016 because the Earth and Mars only align favorably for launches every 26 months.
Any launch delay could potentially add upwards of tens to hundreds of millions of dollars in unbudgeted costs to maintain the spacecraft and rocket – and that’s money that NASA absolutely does not have in these fiscally austere times.
MAVEN and much of NASA are not considered “essential” – despite having responsibility for hundreds of ongoing mission operations costing tens of billions of dollars that benefit society here on Earth. So about 97% of NASA employees were furloughed today.
What’s happening with the spacecraft right now?
“The hardware is being safed, meaning that it will be put into a known, stable, and safe state,” Jakosky elaborated.
Team members say there are about nine days of margin built into the processing schedule, which still includes fueling the spacecraft.
“We’ll turn back on when told that we can. We have some margin days built into our schedule,” Jakosky told me.
“We’re just inside of 7 weeks to launch, and every day is precious, so we’re certainly as anxious as possible to get back to work as quickly as possible.
And he said the team will do whatever necessary, including overtime, to launch MAVEN to the Red Planet by Dec. 7.
“The team is committed to getting to the launch pad at this opportunity, and is willing to work double shifts and seven days a week if necessary. That plus the existing margin gives us some flexibility. “
“That’s why I’m concerned but not yet panicked at this point.”
But a lengthy delay would by problematical.
“If we’re shut down for a week or more, the situation gets much more serious,” Jakosky stated.
Until today, all of the spacecraft and launch preparations had been in full swing and on target – since it arrived on Aug. 2 after a cross country flight from the Colorado assembly facility of prime contractor Lockheed Martin.
Indeed it was all smiles and thumbs up when I was privileged to personally inspect MAVEN inside the clean room at KSC a few days ago on Friday, Sept 27 during a media photo opportunity day held for fellow journalists.
Until now, “MAVEN was on schedule and under budget” said Jakosky in an interview as we stood a few feet from the nearly fully assembled spacecraft.
See my MAVEN clean room photos herein.
And in an ultra rare viewing opportunity, the solar panels were fully unfurled.
“The solar panels look exactly as they will be when MAVEN is flying in space and around Mars.”
“To be here with MAVEN is breathtaking,” Jakosky told me. “
“Its laid out in a way that was spectacular to see!”
If absolutely necessary it might be possible to extend the launch window a little bit beyond Dec. 7, but its uncertain and would require precise new calculations of fuel margins.
“The nominal 20-day launch period doesn’t take into account the fact that our actual mass is less than the maximum allowable mass,” Jakosky explained.
“The last day we can launch has some uncertainty, because it also requires enough fuel to get into orbit before our mission would begin to be degraded.”
It sure was breathtaking for me and all the media to stand beside America’s next Mission to Mars. And to contemplate it’s never before attempted science purpose.
“MAVENS’s goal is determining the composition of the ancient Martian atmosphere and when it was lost, where did all the water go and how and when was it lost,” said Jakosky.
That’s the key to understanding when and for how long Mars was much more Earth-like compared to today’s desiccated Red Planet.
Following a 10 month interplanetary voyage, MAVEN would fire thrusters and brake into Mars orbit in September 2014, joining NASA’s Red Planet armada comprising Curiosity, Opportunity, Mars Odyssey and Mars Reconnaissance Orbiter.
Lets all hope and pray for a short government shutdown – but the outlook is not promising at this time.
Learn more about MAVEN, Curiosity, Mars rovers, Cygnus, Antares, SpaceX, Orion, LADEE, the Govt shutdown and more at Ken’s upcoming presentations
Oct 3: “Curiosity, MAVEN and the Search for Life on Mars – (3-D)”, STAR Astronomy Club, Brookdale Community College & Monmouth Museum, Lincroft, NJ, 8 PM
Oct 8: NASA’s Historic LADEE Lunar & Antares/Cygnus ISS Rocket Launches from Virginia”; Princeton University, Amateur Astronomers Assoc of Princeton (AAAP), Princeton, NJ, 8 PM
50 million light-years away a quasar resides in the hub of galaxy NGC 4438, an incredibly bright source of light and radiation that’s the result of a supermassive black hole actively feeding on nearby gas and dust (and pretty much anything else that ventures too closely.) Shining with the energy of 1,000 Milky Ways, this quasar — and others like it — are the brightest objects in the visible Universe… so bright, in fact, that they are used as beacons for interplanetary navigation by various exploration spacecraft.
“I must go down to the seas again, to the lonely sea and the sky,
And all I ask is a tall ship and a star to steer her by.”
Deep-space missions require precise navigation, especially when approaching bodies such as Mars, Venus, or comets. It’s often necessary to pinpoint a spacecraft traveling 100 million km from Earth to within just 1 km. To achieve this level of accuracy, experts use quasars – the most luminous objects known in the Universe – as beacons in a technique known as Delta-Differential One-Way Ranging, or delta-DOR.
Delta-DOR uses two antennas in distant locations on Earth (such as Goldstone in California and Canberra in Australia) to simultaneously track a transmitting spacecraft in order to measure the time difference (delay) between signals arriving at the two stations.
Unfortunately the delay can be affected by several sources of error, such as the radio waves traveling through the troposphere, ionosphere, and solar plasma, as well as clock instabilities at the ground stations.
Delta-DOR corrects these errors by tracking a quasar that is located near the spacecraft for calibration — usually within ten degrees. The chosen quasar’s direction is already known extremely well through astronomical measurements, typically to closer than 50 billionths of a degree (one nanoradian, or 0.208533 milliarcsecond). The delay time of the quasar is subtracted from that of the spacecraft’s, providing the delta-DOR measurement and allowing for amazingly high-precision navigation across long distances.
“Quasar locations define a reference system. They enable engineers to improve the precision of the measurements taken by ground stations and improve the accuracy of the direction to the spacecraft to an order of a millionth of a degree.”
– Frank Budnik, ESA flight dynamics expert
So even though the quasar in NGC 4438 is located 50 million light-years from Earth, it can help engineers position a spacecraft located 100 million kilometers away to an accuracy of several hundred meters. Now that’s a star to steer her by!
A forthcoming NASA launch to Mars could be in danger of losing its launch window should a shutdown in the United States federal government that began today (Oct. 1) continue for a while. That’s just one of the ways in which NASA is affected amid a lapse of funding that is affecting all government agencies and an untold number of government contractors.
Around 97% of NASA’s 18,000 employees are off the job. Twitter, Facebook, Google Plus and other social media accounts are going dark. NASA’s website is being pulled offline. NASA Television has also ceased broadcasting.
Beyond the agency’s public face, activities ranging from certain commercial crew payouts, to conference attendance, to scientific work will cease. Awards and scholarship approvals will be delayed.
“NASA will shut down almost entirely,” said President Barack Obama in a speech late Monday (Sept. 30).
In addition to the agency’s public relations activities, NASA is planning to launch the Mars Atmosphere and Volatile EvolutioN (MAVEN) spacecraft to Mars in November to examine the Red Planet’s atmosphere. There are all sorts of questions vexing scientists concerning that planet, with one of the most prominent ones being why the atmosphere thinned over the years.
Media reports indicate that if the shutdown is lengthy, MAVEN could miss the launch window and have to try again in 2016.
“A shutdown could delay the pre-launch processing currently under way with a possible impact to the scheduled Nov. 18 launch date,” Dwayne Brown, a NASA senior public affairs officer at NASA, told The Planetary Society in a story published yesterday (Sept. 30). The launch window extends for several weeks beyond that time, however.
The 3% of NASA employees who are deemed essential will work without pay until the situation is resolved. These are some of the things that will continue:
International Space Station monitoring will be maintained, but with the bare minimum of ground crew. (NASA will cease regular updates of the astronauts’ activities during the furlough, although we presume if something urgent happened there would be an update.)
Robotic missions that are already in operation — think the Cassini spacecraft circling Saturn, or the Lunar Atmosphere and Dust Environment Explorer (LADEE) winging its way to the moon — will have small crews making sure that they are functioning properly. No scientific analysis will be conducted, though.
Certain other programs will continue if a shutdown would be detrimental to their performance. Space News reports that the much-delayed James Webb Space Telescope will be among them, as some of its instruments are undergoing cryogenic vacuum testing at the Goddard Space Flight Center.
Update, 1:09 p.m. EDT: Several missions run out of the Jet Propulsion Laboratory and Applied Physics Laboratory are running as usual for at least the next week because these facilities are running under contracted money from NASA and still have funds in the bank. According to the Planetary Society’s Emily Lakdawalla: “At JPL, that includes: Curiosity; Opportunity; Odyssey; Mars Reconnaissance Orbiter; Cassini; Dawn; Juno; Spitzer; the Voyagers; and WISE, among many others. At APL, that includes MESSENGER and New Horizons. It also includes the Deep Space Network.”
Additional Update, 2:09 p.m. EDT: The HiRISE twitter account just replied to inquiries from several space journalists that they will be “open for business” as usual, which is great news since the Mars Reconnaissance Orbiter made an audacious attempt to take images of Comet ISON during the comet’s closest approach to Mars today. We’ll provide any news and updates on images as they become available, but the HiRISE team said getting the images back to Earth and processing them may take a day or two.
HiRISE is still open for business and updates will continue as usual.
Many observers noted that NASA is marking its 55th anniversary today by shutting down its activities. There’s no word yet on when the deadlock in Congress will be resolved. The last two shutdowns in 1995 and 1996 (which began in the middle of the STS-74 shuttle mission to Mir) lasted several weeks.
The Cygnus cargo spacecraft is just a few feet away from the International Space Station’s Canadarm2 during rendezvous and berthing on Sept 29, 2013. Credit: NASA
Updated – See Falcon 9 launch video below[/caption]
Today (Sept. 29) was a doubly historic day for private spaceflight! And a boon to NASA as well!
Early this morning the Orbital Sciences Cygnus commercial cargo ship docked at the International Space Station (ISS) speeding along some 250 miles (400 km) overhead in low Earth orbit.
Barely a few hours later the Next Generation commercial SpaceX Falcon 9 rocket soared to space on a demonstration test flight from the California coast carrying a Canadian satellite to an elliptical earth orbit.
These missions involved the dramatic maiden flights for both Cygnus and the upgraded Falcon 9.
And both were high stakes endeavors, with literally billions of dollars and the future of commercial spaceflight, as well as the ISS, on the line. Their significance cannot be overstated!
Both Cygnus and Falcon 9 were developed with seed money from NASA in a pair of public-private partnerships between NASA and Orbital Sciences and SpaceX under NASA’s COTS commercial transportation initiative aimed at fostering the development of America’s private space industry to deliver critical and essential supplies to the ISS.
The powerful new Falcon 9 will also be used to send cargo to the ISS.
America completely lost its capability to send humans and cargo to the ISS when NASA’s space shuttles were retired in 2011. Orbital Sciences and SpaceX were awarded NASA contracts worth over $3 Billion to restore the unmanned cargo resupply capability over 20 flights totally.
The Cygnus spacecraft put on a spectacular space ballet – and was no worse for the wear after its docking was delayed a week due to an easily fixed communications glitch.
Cygnus is a privately developed resupply vessel built by Orbital Sciences Corp and Thales Alenia Space that is a crucial railroad to orbit for keeping the massive orbital lab complex well stocked with everyday essentials and science experiments that are the purpose of the ISS.
Cygnus was grappled in free drift by Expedition 37 space station astronauts Luca Parmitano and Karen Nyberg at about 7 a.m. EDT Sunday morning.
The pair were working at two robotics work stations from inside the Cupola and Destiny modules. They used the stations 57 foot long Canadarm2 to snare Cygnus at a distance of about 30 feet (10 meters). They gradually motioned the arm closer.
Running a bit ahead of schedule they successfully berthed Cygnus at the earth facing port of the Harmony module by about 8:44 a.m. EDT.
Cygnus was launched to orbit on its inaugural flight on Sept. 18 atop Orbital’s commercial Antares rocket from NASA’s Wallops Flight Facility on the Eastern shore of Virginia.
Hatches to Cygnus will be opened on Monday, Sept. 30 after completing leak checks.
“Today, with the successful berthing of the Orbital Sciences Cygnus cargo module to the ISS, we have expanded America’s capability for reliably transporting cargo to low-Earth orbit, “ said NASA Admisistrator Charles Bolden in a statement.
“It is an historic milestone as this second commercial partner’s demonstration mission reaches the ISS, and I congratulate Orbital Sciences and the NASA team that worked alongside them to make it happen.”
“Orbital joins SpaceX in fulfilling the promise of American innovation to maintain America’s leadership in space. As commercial partners demonstrate their new systems for reaching the Station, we at NASA continue to focus on the technologies to reach an asteroid and Mars,” said Bolden.
Cygnus delivers about 1,300 pounds (589 kilograms) of cargo, including food, clothing, water, science experiments, spare parts and gear to the Expedition 37 crew.
The upgraded SpaceX Falcon 9 blasted off from Space Launch Complex 4 at Vandenberg Air Force Base in California at 9 a.m. PDT (12 p.m. EDT).
Here’s a video of the launch:
It successfully deployed Canada’s 1,060 pound (481 kg) Cascade, Smallsat, and Ionospheric Polar Explorer (CASSIOPE) weather satellite and several additional small satellites.
This powerful new version of the Falcon 9 dubbed v1.1 is powered by a cluster of nine of the new Merlin 1D engines that are about 50% more powerful compared to the standard Merlin 1C engines and can therefore boost a much heavier cargo load to the ISS and beyond.
The next generation Falcon 9 is a monster. It’s much taller than a standard Falcon 9 – some 22 stories vs. 13.
It could launch from Cape Canaveral as early as this Fall.
Learn more about Cygnus, Antares, SpaceX, Curiosity, Mars rovers, MAVEN, Orion, LADEE and more at Ken’s upcoming presentations
Oct 3: “Curiosity, MAVEN and the Search for Life on Mars – (3-D)”, STAR Astronomy Club, Brookdale Community College & Monmouth Museum, Lincroft, NJ, 8 PM
Oct 8: NASA’s Historic LADEE Lunar & Antares/Cygnus ISS Rocket Launches from Virginia”; Princeton University, Amateur Astronomers Assoc of Princeton (AAAP), Princeton, NJ, 8 PM