Dangling Dextre Digs out Docked Dragon Depot prior to Station Departure

Backdropped against a cloudy portion of Earth, Canada’s Dextre robotic "handyman" and Canadarm2 dig out the trunk of SpaceX’s Dragon cargo vessel docked to the ISS after completing a task 225 miles above the home planet. Credit: NASA

To close out their final week aboard the International Space Station, three of the six Expedition 39 crew members are completing their unloading tasks inside the docked commercial SpaceX Dragon cargo freighter and other duties while teams at Mission Control in Houston conduct delicate robotics work outside with dazzling maneuvers of the Dextre robot to remove the last external experiment from the vessels storage truck.

See a dazzling gallery of photos of Dextre dangling outside the docked Dragon depot – above and below.

On Monday, May 5, the robotics team at NASA Mission Control Center at the Johnson Space Center in Houston carefully guided Canada’s Dextre robotic “handyman” attached to the end of the 57-foot long Canadarm2 to basically dig out the final payload item housed in the unpressurized trunk section at the rear of the SpaceX Dragon cargo vessel docked to the ISS.

Dextre stands for “Special Purpose Dexterous Manipulator” and was contributed to the station by the Canadian Space Agency. It measures 12 feet tall and is outfitted with a pair of arms and an array of finely detailed tools to carry out intricate and complex tasks that would otherwise require spacewalking astronauts.

The Canadarm2 with Dextre in its grasp conducts external cargo transfers from the SpaceX Dragon resupply ship.  Credit: NASA TV
The Canadarm2 with Dextre in its grasp conducts external cargo transfers from the SpaceX Dragon resupply ship. Credit: NASA TV

The massive orbiting outpost was soaring some 225 miles above the home planet as Dextre’s work was in progress to remove the Optical PAyload for Lasercomm Science, or OPALS, from the Dragon’s truck.

The next step is to install OPALS on the Express Logistics Carrier-1 (ELC-1) depot at the end of the station’s port truss on Wednesday.

Monday’s attempt was the second try at grappling OPALS. The initial attempt last Thursday “was unsuccessful due to a problem gripping the payload’s grapple fixture with the Special Purpose Dextrous Manipulator, or Dextre,” NASA reported.

A software patch solved the problem.

Canada’s Dextre manipulator attached to Canadarm2 conducts external cargo transfers from the SpaceX Dragon resupply ship.  Credit: NASA TV
Canada’s Dextre manipulator attached to Canadarm2 conducts external cargo transfers from the SpaceX Dragon resupply ship. Credit: NASA TV

Dragon thundered to orbit atop SpaceX’s powerful new Falcon 9 v1.1 rocket on April 18, from Cape Canaveral, Fla.

This unmanned Dragon delivered about 4600 pounds of cargo to the ISS including over 150 science experiments, a pair of hi tech legs for Robonaut 2, a high definition Earth observing imaging camera suite (HDEV), the laser optical communications experiment (OPALS), the VEGGIE lettuce growing experiment as well as essential gear, spare parts, crew provisions, food, clothing and supplies to the six person crews living and working aboard in low Earth orbit, under NASA’s Commercial Resupply Services (CRS) contract.

OPALS uses laser light instead of radio waves to beam back precisely guided data packages to ground stations. The use of lasers should greatly increase the amount of information transmitted over the same period of time, says NASA.

The science experiments carried aboard Dragon are intended for research to be conducted by the crews of ISS Expeditions 39 and 40.

Robotics teams had already pulled out the other payload item from the truck, namely the HDEV imaging suite. It is already transmitting back breathtaking real time video views of Earth from a quartet of video cameras pointing in different directions mounted on the stations exterior.

The SpaceX CRS-3 mission marks the company’s third resupply mission to the ISS under a $1.6 Billion contract with NASA to deliver 20,000 kg (44,000 pounds) of cargo to the ISS during a dozen Dragon cargo spacecraft flights through 2016.

After spending six months in space, Station Commander Koichi Wakata from Japan as well as NASA astronaut Rick Mastracchio and Russian cosmonaut Mikhail Tyurin will be departing the station in a week aboard their Soyuz TMA-11M spacecraft on May 13 at 6:33 p.m. EDT.

They are scheduled to land some 3.5 hours later in the steppes of Kazakhstan at 9:57 p.m. (7:57 a.m. Kazakh time on May 14). The events will be carried live on NASA TV.

SpaceX Falcon 9 rocket and Dragon resupply ship launch from the Cape Canaveral Air Force Station in Florida on April 18, 2014.   Credit:  Jeff Seibert/Wired4Space
SpaceX Falcon 9 rocket and Dragon resupply ship launch from the Cape Canaveral Air Force Station in Florida on April 18, 2014. Credit: Jeff Seibert/Wired4Space
To prepare for the journey home, the trio also completed fit checks on their Russian Sokol launch and entry suits on Monday.

Meanwhile Dragon is also set to depart the station soon on May 18 for a parachute assisted splashdown and recovery by boats in the Pacific Ocean west of Baja California.

Dragon has been docked to the station since arriving on Easter Sunday morning, April 20.

It was grappled using Canadarm 2 and berthed at the Earth facing port of the Harmony module by Commander Wakata and flight engineer Mastracchio while working at the robotics work station inside the seven windowed domed Cupola module.

For the return trip, the Expedition 39 crew is also loading Dragon with precious science samples collected over many months from the crews research activities as well as trash and no longer needed items.

Stay tuned here for Ken’s continuing SpaceX, Orbital Sciences, commercial space, Orion, Chang’e-3, LADEE, Curiosity, Mars rover, MAVEN, MOM and more planetary and human spaceflight news.

Ken Kremer

Court Injunction Blocks Russian Engine Purchase by ULA for US National Security – Win for SpaceX Yields Uncertainty

Atlas V rocket - powered by Russian made RD-180 engines - and Super Secret NROL-67 intelligence gathering payload following rollout to Space Launch Complex 41 at Cape Canaveral Air Force Station, FL, on March 24, 2014. Credit: Ken Kremer - kenkremer.com

United Launch Alliance Atlas V rocket – powered by Russian made RD-180 engines – and Super Secret NROL-67 intelligence gathering payload poised for launch at Space Launch Complex 41 at Cape Canaveral Air Force Station, FL, in March 2014. Credit: Ken Kremer – kenkremer.com
Story updated[/caption]

A US Federal Court has now issued a preliminary injunction that blocks the purchase and importation of Russian rocket engines by United Launch Alliance (ULA) for its Atlas V rocket used in National Security launches for the US Air Force after a filing by SpaceX. But what are the implications?

The US Federal Court of Federal Claims order was issued late Wednesday, April 30, by US Judge Susan G. Braden of the US Court of Federal Claims. The court order is in response to a protest filed by SpaceX against ULA and the US Air Force relating to the uncontested $11 Billion “block buy” launch contract purchase in December of 36 rocket cores for US National Security launches and is also related to US sanctions imposed after Russia’s recent actions in Ukraine and seizing and annexing the Crimea.

The temporary injunction marks a big win for SpaceX but immediately throws future National Security spy satellite and NASA science launches into uncertainty and potential disarray as I reported previously – here and here.

As I posted here last Friday, April 25, SpaceX CEO Elon Musk declared his firms intent to file suit against ULA and the Air Force on Monday, April 28 to break the launch monopoly.

Judge Braden’s injunction followed barely two days later.

Musk said the recent ‘block buy’ launch contract was unfair in blocking SpaceX from competing for launches of surveillance satellites, would cost taxpayers billions of extra dollars in coming years and should be recompetited.

“The national security launches should be put up for competition and they should not be awarded on a sole source, uncompeted basis,” Musk said at the April 25 briefing at the National Press Club in Washington, DC.

SpaceX CEO Elon Musk announces lawsuit protesting Air Force launch contracts while speaking at the National Press Club in Washington, DC on April 25, 2014
SpaceX CEO Elon Musk announces lawsuit protesting Air Force launch contracts while speaking at the National Press Club in Washington, DC on April 25, 2014

ULA quickly vowed today that they will respond to resolve the injunction and further stated that “This opportunistic action by SpaceX … ignores the potential implications to our National Security.”

Federal Judge Braden’s order specifically states the following; “The preliminary injunction prohibits the United States Air Force and United Launch Alliance, from making any purchases from or payment of money to NPO Energomash or any entity, whether governmental, corporate or individual, that is subject to the control of Deputy Prime Minister Rogozin.”

“IT IS SO ORDERED,” wrote Braden.

The engines at the heart of the Federal preliminary injunction are the RD-180 liquid fueled engines which power ULA’s Atlas V rocket and are manufactured in Russia by NPO Energomash – which is majority state owned by the Russian Federation and subject to the control of Russian Deputy Prime Minister Rogozin, who is specifically named on the US economic sanctions target list.

In response, Rogozin said that sanctions could “boomerang” against the US space program. He said that perhaps NASA should “deliver their astronauts to the International Space Station using a trampoline.”

Thanks to the utter folly of US politicians in shutting down the Space Shuttle program before a replacement crew vehicle was available and repeatedly slashing NASA’s commercial crew budget, American astronauts are now 100% dependent on the Russian Soyuz capsule for rides to the ISS and back for several more years ahead.

NASA has NO immediate alternatives to Russia’s Soyuz – period.

The rocket engine injunction is just the latest fallout impacting a vast swath of US space programs from National Defense to NASA stemming from the dangerously escalating crisis between Ukraine and the Russian Federation in the worst confrontation with the West since the Cold War era.

In response to the worsening Ukraine crisis, Western nations have instituted waves of increasingly harsh economic sanctions against Russia and several key members of the Russian government.

Judge Braden’s injunction stands until she receives clarification otherwise from US government entities that the engine purchase is not covered by the Federal government santions.

The order remains in effect “unless and until the court receives the opinion of the United States Department of the Treasury, and the United States Department of Commerce and United States Department of State, that any such purchases or payments will not directly or indirectly contravene Executive Order 13,661.”

ULA issued a swift statement today – received by Universe Today – from ULA’s general counsel Kevin G. MacCary, in response to Judge Braden’s preliminary injunction.

“ULA is deeply concerned with this ruling and we will work closely with the Department of Justice to resolve the injunction expeditiously. In the meantime, ULA will continue to demonstrate our commitment to our National Security on the launch pad by assuring the safe delivery of the missions we are honored to support.”

“SpaceX’s attempt to disrupt a national security launch contract so long after the award ignores the potential implications to our National Security and our nation’s ability to put Americans on board the International Space Station.”

The Atlas V rocket, powered by the Russian made RD-180 engines, will also be used as the launch vehicle by two of the three companies vying for the next round of commercial crew contracts aimed at launching US astronauts to the ISS. The contracts will be awarded by NASA later this year.

“This opportunistic action by SpaceX appears to be an attempt to circumvent the requirements imposed on those who seek to meet the challenging launch needs of the nation and to avoid having to follow the rules, regulations and standards expected of a company entrusted to support our nation’s most sensitive missions,” said ULA.

ULA is a joint venture between aerospace giants Boeing and Lockheed Martin, formed in 2006. It has conducted 81 consecutive launches with 100% mission success – including many NASA science and mission probes like Orion EFT-1, Curiosity, MAVEN, TDRS and more.

Judge Braden furthermore made clear that her order did not include prior RD-180 engine purchases.

“The scope of this preliminary injunction does not extend to any purchase orders that have been placed or moneys paid to NPO Energomash prior to the date of this
Order [April 30, 2014].”

ULA has a two year contingency supply of the RD-180’s and blueprints to begin production, if needed.

However in the event of a cutoff by Russia or US court injuncions, it would take ULA at least three to five years to start and certify RD-180 engine production somewhere in the US, a ULA spokesperson told me recently at Cape Canaveral.

This possibly leaves a 1 to 3 year gap with no Atlas V 1st stage engine supply.

SpaceX claims they can fill part of the launch gap. But their Falcon rockets are not yet certified for National Security launches.

“So far we are most of the way through the certification process. And so far there have been zero changes to the rocket. Mostly it’s just been a paperwork exercise.”

“In light of international events, this seems like the wrong time to send hundreds of millions of dollars to the Kremlin,” said Musk during the April 25 press briefing at the National Press Club in Washington, DC.

SpaceX is suing the Air Force for the right to compete for US national security satellites launches using Falcon 9 rockets such as this one which successfully launched the SES-8 communications satellite on Dec. 3, 2013 from Pad 40 at Cape Canaveral, FL. Credit: Ken Kremer/kenkremer.com
SpaceX is suing the Air Force for the right to compete for US national security satellites launches using Falcon 9 rockets such as this one which successfully launched the SES-8 communications satellite on Dec. 3, 2013 from Pad 40 at Cape Canaveral, FL. Credit: Ken Kremer/kenkremer.com

Watch for my continuing articles as the Ukraine crisis escalates and court orders fly – with uncertain and potentially dire consequences for US National Security and NASA.

Stay tuned here for Ken’s continuing SpaceX, Orbital Sciences, commercial space, Orion, Chang’e-3, LADEE, Mars rover, MAVEN, MOM and more planetary and human spaceflight news.

Ken Kremer

Curiosity rover launches to Mars atop Atlas V rocket on Nov. 26, 2011 from Cape Canaveral, Florida.  Credit: Ken Kremer
NASA’s Curiosity rover launches to Mars atop Atlas V rocket on Nov. 26, 2011 from Cape Canaveral, Florida. Atlas V 1st stage is powered by Russian made RD-180 engines.
Credit: Ken Kremer – kenkremer.com

HD Livestream of Earth Now Available 24/7 from the Space Station

Screenshot from the HDEV cameras on the International Space Station. Via @ISS101



Live streaming video by Ustream

Now, live from space, it’s Earth all the time! A new experiment called the High Definition Earth Viewing (HDEV) was launched on April 18, 2014 in the “trunk” on the SpaceX Dragon spacecraft and has been set up outside the International Space Station. The set of four commercial HD video cameras and is now operational, after being installed on the External Payload Facility of the ESA Columbus module yesterday. The cameras and electronics are enclosed in a pressurized box to provide protection to the equipment from the harsh environment of space.

Above is the UStream video, or you can bookmark the UStream site here, or view this page from Johnson Space Center which also provides a visual tracker of where the ISS is located over Earth.

Please note that the screen will appear black when the ISS is in orbital night — which happens every 90 minutes and lasts about 40 minutes. There also has been some downtime off and on that I’ve noted while watching this morning. This may be due to some initial setup/operation issues, or some occurrences of loss of signal. UPDATE: NASA’s now provided additional info on what’s happening if you’re not seeing beautiful views of Earth at anytime during the live feed: Black Scenes = Night side of the Earth; Gray Scenes = Switching to the next camera, or the communications downlink from the ISS in not available at the moment.

Also, the live video feed from HDEV will occasionally be unavailable due to loss of Ku-band transmission from the International Space Station. If that happens, just check the site again later.

But, having live HD streaming views of Earth is pretty awesome – but it’s also nifty to note that this is part of a student project.

High school students helped design of some of the HDEV components through the High Schools United with NASA to Create Hardware (HUNCH) program. Student teams will also help operate the experiment.

This experiment is completely separate from the UrtheCast commercial cameras on the ISS.

The HDEV does not record video on board the ISS, but all video is transmitted to the ground in real time. See the graphic below that explains how the cameras cycle automatically.

Part of the experiment is to test out the camera and equipment and assess the hardware’s ability to survive and function for long periods in space.

Enjoy!

HDEV11

U.S. Should Send Astronauts To Space Station By Trampoline: Russian Official

Screen capture from NASA TV of the Soyuz approaching the International Space Station with the Expedition 35/36 crew. Via NASA TV

Facing sanctions from the United States government, a high-ranking Russian official took to Twitter today (April 29) to express his frustration, warning that NASA has few options should Soyuz flights to the International Space Station cease.

“After analyzing the sanctions against our space industry, I suggest to the USA to bring their astronauts to the International Space Station using a trampoline,” wrote Dmitry Rogozin, Russia’s deputy prime minister, in a Russian-language tweet highlighted by NBC News.

The jibe points to the fact that only the Russians can bring crews up to the space station right now. Rogozin also linked to a story in Russian RT where he is quoted as saying (if Google Translate is correct) that the Americans will see a “boomerang” of sanctions laid upon Russian officials.

On April 2, as part of a larger policy of the Obama administration, NASA announced it would cease most connections with Russia except for those essential ones related to the International Space Station. NASA administrator Charles Bolden has repeatedly said that things are normal with the Russians when it comes to the station.

Structure arms for Soyuz TMA-11M (the launching vehicle for Expedition 38) raise into place in this long-exposure photograph taken in Kazakhstan. Credit: NASA/Bill Ingalls
Structure arms for Soyuz TMA-11M (the launching vehicle for Expedition 38) raise into place in this long-exposure photograph taken in Kazakhstan. Credit: NASA/Bill Ingalls

The United States is dependent on the Russian Soyuz to bring astronauts to the space station. The U.S. method of transportation ceased in 2011 after the space shuttle retired, and commercial spacecraft — though being developed — are not expected to be ready until about 2017.

That said, one of the developers of these spacecraft — SpaceX CEO Elon Musk — wrote on Twitter that the public will soon see the unveiling of the human-rated Dragon spacecraft that the company has been working on with contract money from NASA. (The other funded spacecraft proposals are Boeing’s CST-100 and Sierra Nevada’s Dream Chaser).

The Russian situation is expected to weigh heavily on NASA budget discussions for fiscal 2014 and 2015 as agency officials try to make their case that commercial funding should be sustained, or even increased, for Americans to be able to launch from their own soil again quickly.

SpaceX CEO Elon Musk Sues Government to Break US Air Force’s National Security Launch Monopoly

SpaceX CEO Elon Musk announces lawsuit protesting Air Force launch contracts while speaking at the National Press Club in Washington, DC on April 25, 2014

SpaceX CEO Elon Musk announces lawsuit protesting Air Force launch contracts while speaking at the National Press Club in Washington, DC on April 25, 2014
Story updated[/caption]

Elon Musk, CEO and founder of the upstart commercial launch venture SpaceX, announced at a press conference today, Friday, April 25, that SpaceX is filing suit against the Federal Government to protest and break the US Air Force’s awarding of lucrative launch contracts for high priority national security satellites to a sole rocket provider – United Launch Alliance (ULA) – on a non competitive basis.

The gloves are officially off in the intensely mounting duel over multibillion dollar Air Force military launch contracts between SpaceX and ULA.

“The official protest document will be available Monday, April 28th at www.freedomtolaunch.com and will be filed with the United States Court of Federal Claims in Washington, D.C.,” said SpaceX in an official statement.

Musk said the Air Force launch contract with ULA amounted to a continuing monopoly, was unfair by blocking SpaceX from competing for launches of surveillance satellites and would cost taxpayers billions of extra dollars in coming years.

“What we feel is that this is not right – that the national security launches should be put up for competition and they should not be awarded on a sole source, uncompeted basis,” said Musk at the briefing called on short notice and held at the National Press Club in Washington, DC.

SpaceX is suing the Air Force for the right to compete for US national security satellites launches using Falcon 9 rockets such as this one which successfully launched the SES-8 communications satellite on Dec. 3, 2013 from Pad 40 at Cape Canaveral, FL. Credit: Ken Kremer/kenkremer.com
SpaceX is suing the Air Force for the right to compete for US national security satellites launches using Falcon 9 rockets such as this one which successfully launched the SES-8 communications satellite on Dec. 3, 2013 from Pad 40 at Cape Canaveral, FL. Credit: Ken Kremer/kenkremer.com

The latest Air Force launch contract dated to December 2013 guarantees the “block buy” purchase of 36 rocket cores from ULA for national security launches for the DOD, NRO and other government agencies, at a significantly reduced cost compared to earlier contracts.

A further 14 cores were to be awarded on a competitive basis, including bids from SpaceX and others who seek to gain Air Force certification. Several of those launch awards have now been deferred indefinitely.

ULA is a joint venture between aerospace giants Boeing and Lockheed Martin, formed in 2006, that has launched over 80 satellites to orbit and beyond including many NASA science and mission probes like Orion EFT-1, Curiosity, MAVEN, TDRS and more.

It manufactures the Delta IV and Atlas V unmanned, expendable rocket families that are currently the only boosters certified to launch the high value military payloads at issue in the lawsuit announced on Friday by Musk.

The newest versions of the Delta and Atlas rockets – known as EELV’s (Evolved Expendable Launch Vehicles) have had nearly flawless records of success since being introduced some dozen years ago by the companies individually, before the ULA merger.

Atlas V rocket and Super Secret NROL-67 intelligence gathering payload following rollout to Space Launch Complex 41 at Cape Canaveral Air Force Station, FL, on March 24, 2014. Credit: Ken Kremer - kenkremer.com
Atlas V rocket and Super Secret NROL-67 intelligence gathering payload following rollout to Space Launch Complex 41 at Cape Canaveral Air Force Station, FL, on March 24, 2014. Credit: Ken Kremer – kenkremer.com

Musk wants his company’s newer and he says much cheaper Falcon 9 and Falcon Heavy rockets to be certified by the Air Force and included in the competition for launch contracts.

To date the Falcon 9 has launched only 9 times. Only four of those were in the new and more powerful configuration needed by the Air Force.

Musk is not asking that the launches be awarded outright to SpaceX. But he does want the Air Force contract cancelled and re-competed.

“We’re just protesting and saying that the launches should be competed,” Musk said.

“If we compete and lose that’s fine. But why were they not even competed? That just doesn’t make sense.”

“So far we are most of the way through the certification process. And so far there have been zero changes to the rocket. Mostly it’s just been a paperwork exercise.”

“Since this is a large multiyear contract, why not wait a few months for the certification process to complete. And then do the competition. That seems very reasonable to me.”

Musk said it costs four times more to launch ULA’s Delta or Atlas rocket vs. a SpaceX Falcon rocket.

“The ULA rockets are basically four times more expensive than ours. So this contract is costing US taxpayers billions of dollars for no reason.”

“Each launch by ULA costs American taxpayers roughly $400 million per launch. They are insanely expensive. I don’t know why they are so expensive.”

The Falcon 9 lists for about $60 Million per launch, but rises to about $100 million after the certification costs are included, Musk explained.

“So yes the certification does make our Falcon 9 rocket more expensive. But not 400% more expensive.”

“Our rockets are 21st century design,” said Musk to obtain the most efficiency. He said ULA’s designs date back to the 90s and earlier with heritage hardware.

SpaceX founder and CEO Elon Musk briefs reporters including Universe Today in Cocoa Beach, FL prior to SpaceX Falcon 9 rocket blastoff with SES-8 communications satellite on Dec 3, 2013 from Cape Canaveral, FL. Credit: Ken Kremer/kenkremer.com
SpaceX founder and CEO Elon Musk briefs reporters including Universe Today in Cocoa Beach, FL prior to SpaceX Falcon 9 rocket blastoff with SES-8 communications satellite on Dec 3, 2013 from Cape Canaveral, FL. Credit: Ken Kremer/kenkremer.com

To date the Falcon 9 has already been used three times under a $1.6 Billion contract with NASA to launch the private SpaceX Dragon resupply vessel to the International Space Station (ISS) – most recently a week ago during the April 18 blastoff of the SpaceX CRS-3 mission from Cape Canaveral.

It is also being used to launch highly expensive communications satellites like SES-8 and Thaicom-6 for private companies to geostationary orbits.

“It just seems odd that if our vehicle is good enough for NASA and supporting a $100 billion space station, and it’s good enough for launching NASA science satellites, for launching complex commercial geostationary satellites, then there’s no reasonable basis for it not being capable of launching something quite simple like a GPS satellite,” said Musk.

“Our only option is to file a protest.”

Furthermore as I wrote here in a prior article, US National Security launches are now potentially at risk due to the ongoing crisis between Russian, Ukraine and Crimea because the RD-180 first stage engines powering the Atlas V are designed and manufactured in Russia by NPO Energomash, majority owned by the Russian Federation.

SpaceX CEO Elon Musk announces lawsuit protesting Air Force launch contracts while speaking at the National Press Club in Washington, DC on April 25, 2014.
SpaceX CEO Elon Musk announces lawsuit protesting Air Force launch contracts while speaking at the National Press Club in Washington, DC on April 25, 2014

“The head of the Russian space sector, Dmitry Rogozin, was sanctioned by the White House in March 2014 in the wake of Russia’s aggression in Ukraine,” says SpaceX.

The RD-180 engine supply could be cut off in a worst case scenario if economic sanctions against Russia are increased by the Western allies.

ULA has a two year contingency supply of the RD-180’s and blueprints to begin production, if needed.

However in the event of a cutoff, it would take at least three to five years to start and certify RD-180 engine production somewhere in the US, a ULA spokesperson told me recently at Cape Canaveral.

This possibly leaves a 1 to 3 year gap with no Atlas V 1st stage engine supply.

The Delta IV rockets and engines by contrast are manufactured in the US.

“In light of international events, this seems like the wrong time to send hundreds of millions of dollars to the Kremlin,” said Musk.

“Yet, this is what the Air Force’s arrangement with ULA does, despite the fact that there are domestic alternatives available that do not rely on components from countries that pose a national security risk.”

Stay tuned here for Ken’s continuing SpaceX, Orbital Sciences, commercial space, Orion, Chang’e-3, LADEE, Mars rover, MAVEN, MOM and more planetary and human spaceflight news.

Ken Kremer

UPDATE: Spacewalkers Zip Through Tasks To Fix Broken Computer

Steve Swanson, commander of Expedition 40, during a spacewalk on 2007 shuttle mission STS-117. Credit: NASA

UPDATE, 11:42 a.m. EDT: Rick Mastracchio and Steve Swanson finished their spacewalk in just 1 hour and 36 minutes, nearly an hour faster than what NASA budgeted for. Early tests show the replacement computer is working well, providing backup once again for the robotics, solar arrays and other systems on station.

Can two astronauts fix a broken computer quickly on the International Space Station, preventing possible problems with the solar arrays and robotics? Watch live (above) to find out.

The NASA spacewalk involving Rick Mastracchio and Steve Swanson is scheduled to start today (April 23) at 9:20 a.m. EDT (1:20 p.m. UTC), with coverage starting around 8:30 a.m. EDT (12:30 p.m. UTC). The spacewalk is scheduled to last 2.5 hours. Bear in mind that the times could change as circumstances arise.

The computer, also called a multiplexer/demultiplexer (MDM), failed for unknown reasons a couple of weeks ago. While the primary computer is working perfectly and the crew is in no danger, things get more risky if the primary computer also breaks. That’s why NASA worked to get the spacewalkers outside as quickly as possible. You can see a full briefing of the rationale here.

As a note, all non-urgent spacewalks have been suspended because NASA is still working on addressing the recommendations given after a life-threatening water leak took place in a NASA spacesuit last summer. Urgent spacewalks can still go ahead because the agency has implemented safety measures such as snorkels and helmet absorption pads in case of another leak.

That said, in the months since NASA has traced the problem to contamination in a filter in the fan pump separator. After replacing the separator, the leaky spacesuit was used during two contingency spacewalks in December with no water problems at all.

Easter Sunday Space Station Rendezvous and Berthing for SpaceX Dragon Freighter Successful

SpaceX Dragon resupply spacecraft arrives for successful berthing and docking at the International Space Station on Easter Sunday morning April 20, 2014. Credit: NASA TV

The SpaceX 3 Dragon commercial cargo freighter successfully arrived at the International Space Station (ISS) on Easter Sunday morning, April 20, as planned and was deftly captured by Expedition 39 Commander Koichi Wakata at 7:15 a.m. EDT at the controls of the Canadian built robotic arm.

The next step due shortly is berthing of Dragon at the Earth facing port of the Harmony module at approximately 9:30 a.m. EDT.

Berthing was officially completed at 10:06 a.m. EDT while the massive complex was soaring 260 miles above Brazil.

This story is being updated as events unfold. The mission is the company’s third cargo delivery flight to the station.

The Dragon vehicle loaded with nearly 2.5 tons of science experiments and supplies moved ever so slowly closely to within grappling distance – dramatically backdropped with gorgeous and ever changing scenery of our Home Planet sliding below.

The million pound orbiting lab complex and free flying SpaceX Dragon were soaring some 260 miles above Egypt and the Nile River as the 57 foot long robotic arm grappled the resupply ship.

SpaceX Dragon resupply spacecraft arrives for berthing at the International Space Station on Easter Sunday morning April 20, 2014. Credit: NASA TV
SpaceX Dragon resupply spacecraft arrives for berthing at the International Space Station on Easter Sunday morning April 20, 2014. Credit: NASA TV

Dragon was approximately 30 feet (10 meters) away from the stations hull at the time of capture.

Wakata, of the Japan Aerospace Exploration Agency, was assisted by NASA astronaut Rick Mastracchio, while both were working from inside the 7 windowed Cupola robotics work station. Newly arrived NASA astronaut Steve Swanson observed the proceedings with a big smile.

“Congratulations to the entire ops team for the successful launch, rendezvous and capture of Dragon,” Wakata radioed mission control moments after the successful grapple.

“Great work catching the Dragon, enabling fantastic science,” radioed Capcom Steve Fisher from NASA Houston Mission Control.

SpaceX Dragon resupply spacecraft grappled by Canada robotic arm for berthing at the International Space Station on Easter Sunday morning April 20, 2014. Backdrop of Erath look like dried out river channel on Mars! Credit: NASA TV
SpaceX Dragon resupply spacecraft grappled by Canada robotic arm for berthing at the International Space Station on Easter Sunday morning April 20, 2014. Backdrop of Earth looks like dried out river channel on Mars! Credit: NASA TV

Cheers and celebrations erupted at SpaceX Mission Control at the firms headquarters in Hawthorne, Calif.

Dragon arrived this morning following Friday afternoons, Apr 18, spectacular blastoff from Cape Canaveral, Fla, atop an upgraded SpaceX Falcon 9 booster.

A two day orbital chase ensued with a series of critical engine burns targeting the ISS for Easter Sunday’s rendezvous and docking activities.

Rick Mastracchio was at the controls for the actual berthing and latching in place at Harmony with Dragon’s Common Berthing Mechanism (CBM).

NASA astronaut Steve Swanson, ISS Commander Koichi Wakata and NASA Astronaut Rick Mastracchio work inside the 7 windowed Cupola robotics work station module during Dragon berthing on Easter Sunday morning April 20, 2017. Credit: NASA TV
NASA astronaut Steve Swanson, ISS Commander Koichi Wakata and NASA Astronaut Rick Mastracchio work inside the 7 windowed Cupola robotics work station module during Dragon berthing on Easter Sunday morning April 20, 2017. Credit: NASA TV

The berthing process started at about 9:30 a.m. EDT.

4 latches were driven for 1st stage of capture. Followed by all 16 bolts and latches in total during second stage capture to firmly hold Dragon in place.

The crew and mission control concluded the berthing procedure at 10:06 a.m. EDT flying over Brazil.

The next step is for the crew to pressurize the vestibule connecting Dragon to station.

Hatch opening is set to take place on Monday morning.

It’s a busy week ahead for the six person international crew representing the US, Russia and Japan.

A Russian Progress departs on Wednesday followed by the 2 person US spacewalk to replace the failed MDM unit.

Dragon will remain attached to the station until May 18.

This story is being updated. Check back.

ISS Schematic showing modules and Dragon, Soyuz and Progress docking ports.  Credit: NASA TV
ISS Schematic showing modules and Dragon, Soyuz and Progress docking ports. Credit: NASA TV

The SpaceX-3 mission marks the company’s third operational resupply mission to the ISS under a $1.6 Billion contract with NASA to deliver 20,000 kg (44,000 pounds) of cargo to the ISS during a dozen Dragon cargo spacecraft flights through 2016.

There are over 150 science experiments loaded aboard the Dragon capsule for research to be conducted by the crews of ISS Expeditions 39 and 40.

This unmanned SpaceX mission dubbed CRS-3 mission will deliver some 5000 pounds of science experiments, a pair of hi tech legs for Robonaut 2, a high definition Earth observing imaging camera suite (HDEV), a laser optical communications experiment (OPALS) and essential gear, the VEGGIE lettuce growing experiment, spare parts, crew provisions, food, clothing and supplies to the six person crews living and working aboard the ISS soaring in low Earth orbit under NASA’s Commercial Resupply Services (CRS) contract.

NASA TV coverage of the Easter Sunday grappling process began at 5:45 a.m. EDT with berthing coverage beginning at 9:30 a.m. EDT: http://www.nasa.gov/ntv

Stay tuned here for Ken’s continuing SpaceX, Orbital Sciences, commercial space, Orion, Chang’e-3, LADEE, Mars rover, MAVEN, MOM and more planetary and human spaceflight news.

Screenshots by Rob v. Mackelenbergh.

Ken Kremer

SpaceX Makes Strides Towards 1st Stage Falcon Rocket Recovery during Space Station Launch

Blastoff of SpaceX Falcon 9 rocket from Cape Canaveral Air Force Station in Florida on April 18, 2014. Credit: Alan Walters/AmericaSpace

Blastoff of SpaceX Falcon 9 rocket from Cape Canaveral Air Force Station in Florida on April 18, 2014. Credit: Alan Walters/AmericaSpace
Story updated[/caption]

The powerful SpaceX Falcon 9 rocket that launched successfully on a cargo delivery run for NASA bound for the Space Station on Friday, April 18, from Cape Canaveral, Fla, also had a key secondary objective for the company aimed at experimenting with eventually recovering the rockets first stage via the use of landing legs and leading to the boosters refurbishment and reuse further down the road.

Marking a first of its kind test, this 20 story tall commercial Falcon 9 rocket was equipped with a quartet of landing legs to test controlled soft landing techniques first in the ocean and then back on solid ground at some later date this year or next – by reigniting the 1st stage engines for a guided touchdown.

The 12 foot diameter Falcon 9 rocket would sprout the legs just prior to water impact for the controlled soft landing in the Atlantic Ocean, guided by SpaceX engineers.

'Threading the needle', the Falcon 9/Dragon vehicle passes through the catenary lightning wires as it roars from the pad on the CRS-3 mission.  Credit: nasatech.net
‘Threading the needle’, the Falcon 9/Dragon vehicle passes through the catenary lightning wires as it roars from the pad on the CRS-3 mission. Credit: nasatech.net

Prior to the launch SpaceX managers were careful not to raise expectations.

“The entire recovery of the first stage is completely experimental,” said Hans Koenigsmann, SpaceX vice president of mission assurance. “It has nothing to do with the primary mission.”

He estimated the odds of successfully retrieving an intact booster at merely 30 or 40 percent.

Following Friday’s blastoff, SpaceX reported they made significant strides towards that goal of a 1st stage recovery.

1st stage of SpaceX Falcon 9 rocket equipped with landing legs and now scheduled for launch to the International Space Station on March 16, 2014 from Cape Canaveral, FL. Credit: SpaceX/Elon Musk
1st stage of SpaceX Falcon 9 rocket equipped with landing legs which launched to the International Space Station on April 18, 2014 from Cape Canaveral, FL. Credit: SpaceX/Elon Musk

SpaceX engineers had preprogrammed the spent first stage to relight several Merlin 1 D engines after completing the boost phase and stage seperation to stabilize it, reduce its roll rate and then gradually lower its altitude back down to the Atlantic Ocean’s surface for a soft landing attempt and later possible recovery by retrieval ships.

All these critical steps seemed to go fairly well in initial reports that are subject to change.

SpaceX CEO and founder Elon Musk reported at a post launch briefing and later tweeted further updates that the Falcon 9 first stage actually made a good water landing despite rough seas, with waves swelling at least six feet.

“Roll rate close to zero (v important!).”

“Data upload from tracking plane shows landing in Atlantic was good! Several boats enroute through heavy seas,” Musk tweeted.

Furthermore he reported that the 1st stage survived the ocean touchdown.

“Flight computers continued transmitting for 8 seconds after reaching the water. Stopped when booster went horizontal.”

Because of the high waves, the recovery boats had difficulty reaching the booster in the recovery area located some two hundred miles off shore from Cape Canaveral.

Several previous attempts by SpaceX to recover the first stage via parachutes and thrusters were not successful. So SpaceX adopted this new approach with the landing legs and 1st stage Merlin 1 D engines.

Further details will be proved when they become available.

SpaceX Falcon 9 rocket liftoff on April 18, 2014 from Space Launch Complex 40 at Cape Canaveral, Fla.  Credit: Julian Leek
SpaceX Falcon 9 rocket liftoff on April 18, 2014 from Space Launch Complex 40 at Cape Canaveral, Fla. Credit: Julian Leek

The attachment of the 25 foot long 1st stage landing legs to SpaceX’s next-generation Falcon 9 rocket for ocean recovery counts as a major step towards the firm’s future goal of building a fully reusable rocket and dramatically lowering launch costs compared to expendable boosters.

The eventual goal is to accomplish a successful first stage touchdown by the landing legs on solid ground back somewhere near on Cape Canaveral, Florida.

Musk said that SpaceX is still working out the details on finding a suitable landing location with NASA and the US Air Force.

SpaceX Falcon 9 rocket and Dragon resupply ship launch from the Cape Canaveral Air Force Station in Florida on April 18, 2014.   Credit:  Jeff Seibert/Wired4Space
SpaceX Falcon 9 rocket and Dragon resupply ship launch from the Cape Canaveral Air Force Station in Florida on April 18, 2014. Credit: Jeff Seibert/Wired4Space

Extensive work and testing remains to develop and refine the technology before a land landing will be attempted by the company, says Musk.

It will be left to future missions to accomplish a successful first stage touchdown by the landing legs back on solid ground back through a series of ramped up rocket tests at Cape Canaveral, Florida.

“Even though we probably won’t get the stage back, I think we’re really starting to connect the dots of what’s needed,” Musk said at the briefing.

“There are only a few more dots that need to be there to have it all work. I think we’ve got a decent chance of bringing a stage back this year, which would be wonderful.”

Overall Musk was very pleased with the performance of the rocket and the landing leg test.

“I would consider it a success in the sense that we were able to control the boost stage to a zero roll rate, which is previously what has destroyed the stage, an uncontrolled roll, where the on-board nitrogen thrusters weren’t able to control the aerodynamic torque and spun up.”

“This time, with more powerful thrusters and more nitrogen propellant, we were able to null the roll rates.”

“I’m feeling pretty excited,” Musk stated. “This is a happy day. Most important of all is that we did a good job for NASA.”

This extra powerful new version of the Falcon 9 dubbed v1.1 is powered by a cluster of nine of SpaceX’s new Merlin 1D engines that are about 50% more powerful compared to the standard Merlin 1C engines. The nine Merlin 1D engines 1.3 million pounds of thrust at sea level rises to 1.5 million pounds as the rocket climbs to orbit.

Therefore the upgraded Falcon 9 can boost a much heavier cargo load to the ISS, low Earth orbit, geostationary orbit and beyond.

Indeed Dragon is loaded with nearly 5000 pounds of cargo, about double the weight carried previously.

If all goes well, Dragon will reach the ISS early on Easter Sunday morning after a two day orbital chase.

Station crew members Rick Mastracchio and Steven Swanson will grapple the Dragon cargo freighter with the 57 foot long Canadarm2 on Easter Sunday at about 7:14 a.m. and then berth it at the Earth-facing port of the Harmony module.

NASA TV coverage of the Easter Sunday grappling process will begin at 5:45 a.m. with berthing coverage beginning at 9:30 a.m. : http://www.nasa.gov/ntv

Stay tuned here for Ken’s continuing SpaceX, Orbital Sciences, commercial space, Orion, Chang’e-3, LADEE, Mars rover, MAVEN, MOM and more planetary and human spaceflight news.

Ken Kremer

Rising slowly from Pad 40, the fully loaded Dragon and Falcon 9 v1.1 vehicle begin the mission to ISS. Credit: nasatech.net
Rising slowly from Pad 40, the fully loaded Dragon and Falcon 9 v1.1 vehicle begin the mission to ISS. Credit: nasatech.net

SpaceX Commercial Dragon Resupply Ship Thunders to Space Bound for ISS and Easter Sunday Berthing – Photo Gallery

SpaceX Falcon 9 rocket and Dragon resupply ship launch from the Cape Canaveral Air Force Station in Florida on April 18, 2014. Credit: Jeff Seibert/Wired4Space

SpaceX Falcon 9 rocket and Dragon resupply ship launch from the Cape Canaveral Air Force Station in Florida on April 18, 2014. Credit: Jeff Seibert/Wired4Space
See expanding launch gallery below[/caption]

A mighty SpaceX rocket carrying the firms commercial Dragon resupply ship loaded with nearly 2.5 tons of NASA science instruments and critical supplies thundered to space this afternoon on a two day journey bound for the International Space Station.

The Dragon vessel launched atop the 20 story tall, upgraded Falcon 9 rocket from Space Launch Complex 40 at Cape Canaveral Air Force Station in Florida precisely on time at 3:25 p.m. EDT (1925 GMT), Friday, April 18.

“I want to congratulate SpaceX. Everyone did a great job” said William Gerstenmaier, NASA associate administrator for human exploration and operations, at a post launch briefing at the Kennedy Space Center press site.

“The SpaceX team went the extra mile to get everything ready for an on time launch.”

The spectacular blastoff went off without a hitch despite a poor weather prognosis in the morning that brightened considerably in the final hours leading up to the afternnon liftoff.

“Everything went well with the ascent,” said SpaceX CEO and founder Elon Muck at the briefing.

“I’m pretty excited. We did a good gob for our NASA customer and that’s very important,” Musk added.

The on time blastoff sets the stage for an Easter Sunday, April 20, rendezvous and berthing of the Dragon resupply spacecraft at the massive orbiting outpost packed with a striking variety of science experiments and needed supplies for the six person crew.

Station crew members Rick Mastracchio and Steven Swanson will grapple the Dragon cargo freighter with the 57 foot long Canadarm2 on Easter Sunday at about 7:14 a.m. if all goes well and then berth it at the Earth-facing port of the Harmony module.

The SpaceX-3 mission marks the company’s third resupply mission to the ISS under a $1.6 Billion contract with NASA to deliver 20,000 kg (44,000 pounds) of cargo to the ISS during a dozen Dragon cargo spacecraft flights through 2016.

There are over 150 science experiments loaded aboard the Dragon capsule for research to be conducted by the crews of ISS Expeditions 39 and 40.

“SpaceX is delivering important research experiments and cargo to the space station,” said Gerstenmaier.

SpaceX Falcon 9 rocket clears the tree line on April 18, 2014 on science mission bound for the ISS from Cape Canaveral, Florida   Credit:  Nicole Solomon
SpaceX Falcon 9 rocket clears the tree line on April 18, 2014 on science mission bound for the ISS from Cape Canaveral, Florida. Credit: Nicole Solomon

“The diversity and number of new experiments is phenomenal. The investigations aboard Dragon will help us improve our understanding of how humans adapt to living in space for long periods of time and help us develop technologies that will enable deep space exploration.”

This unmanned SpaceX mission dubbed CRS-3 mission will deliver some 5000 pounds of science experiments, a pair of hi tech legs for Robonaut 2, a high definition imaging camera suite, an optical communications experiment (OPALS) and essential gear, the VEGGIE lettuce growing experiment, spare parts, crew provisions, food, clothing and supplies to the six person crews living and working aboard the ISS soaring in low Earth orbit under NASA’s Commercial Resupply Services (CRS) contract.

Robonaut 2 engineering model equipped with new legs like those heading to the ISS on upcoming SpaceX CRS-3 launch were on display at the Kennedy Space Center Visitor Complex on March 15, 2014. Credit: Ken Kremer - kenkremer.com
Robonaut 2 engineering model equipped with new legs like those heading to the ISS on upcoming SpaceX CRS-3 launch were on display at the Kennedy Space Center Visitor Complex on March 15, 2014. Credit: Ken Kremer – kenkremer.com

To date SpaceX had completed two operational cargo resupply missions and a test flight. The last flight dubbed CRS-2 blasted off a year ago on March 1, 2013 atop the initial version of the Falcon 9 rocket.

The next launch of Orbital Sciences Antares/Cygnus commercial rocket to the ISS from NASA Wallops, VA, was tentatively slated for May 6. But the target date will now slip to into mid-June since it can’t arrive until the Dragon departs.

Blastoff of SpaceX Falcon 9 rocket from Cape Canaveral Air Force Station in Florida on April18, 2014.   Credit:  Alan Walters/AmericaSpace
Blastoff of SpaceX Falcon 9 rocket from Cape Canaveral Air Force Station in Florida on April18, 2014. Credit: Alan Walters/AmericaSpace

Both the Dragon and Antares dock at the same port on the Harmony module at the end of the station.

This extra powerful new version of the Falcon 9 dubbed v1.1 is powered by a cluster of nine of SpaceX’s new Merlin 1D engines that are about 50% more powerful compared to the standard Merlin 1C engines. The nine Merlin 1D engines 1.3 million pounds of thrust at sea level rises to 1.5 million pounds as the rocket climbs to orbit

Stay tuned here for Ken’s continuing SpaceX, Orbital Sciences, commercial space, Orion, Chang’e-3, LADEE, Mars rover, MAVEN, MOM and more planetary and human spaceflight news.

Ken Kremer

SpaceX Falcon 9 rocket liftoff on April 18, 2014 from Space Launch Complex 40 at Cape Canaveral, Fla.  Credit: Julian Leek
SpaceX Falcon 9 rocket liftoff on April 18, 2014 from Space Launch Complex 40 at Cape Canaveral, Fla. Credit: Julian Leek
Blastoff of SpaceX Falcon 9 rocket from Cape Canaveral Air Force Station in Florida on April18, 2014.   Credit:  John Studwell
Blastoff of SpaceX Falcon 9 rocket from Cape Canaveral Air Force Station in Florida on April 18, 2014. Credit: John Studwell/AmericaSpace
Liftoff of SpaceX Falcon 9 rocket and Dragon from Cape Canaveral Air Force Station, Fla, April 18, 2014.   Credit: Ken Kremer/kenkremer.com
Liftoff of SpaceX Falcon 9 rocket and Dragon from Cape Canaveral Air Force Station, Fla, April 18, 2014. Credit: Ken Kremer/kenkremer.com
The SpaceX Falcon 9 rocket launches from the Cape Canaveral Air Force Station in Florida on April18, 2014.   Credit:   NASA TV
The SpaceX Falcon 9 rocket launches from the Cape Canaveral Air Force Station in Florida on April 18, 2014. Credit: NASA TV

Urgent Spacewalk Must Dance Between Dragon and Progress Spacecraft

NASA astronaut Steve Swanson does a spacesuit fit check prior to the launch of Expedition 39 in March 2014. Credit: NASA

It’s a good thing that next week’s urgent spacewalk is pegged as a short one, because the coming days will be hectic for the Expedition 39 crew.

Finding a spot for even a 2.5-hour excursion on the International Space Station was extremely challenging, NASA officials said in a news conference today (April 18), because crew time also is needed for two cargo spacecraft: the SpaceX Dragon launch scheduled for today and subsequent Progress undocking/redocking on station.

Here’s a rundown of some things NASA was juggling as it moves hastily to replace a failed backup computer on the outside of the station. Rick Mastracchio and Steve Swanson are expected to go “outside” on Wednesday (April 23), but if today’s SpaceX launch is delayed the spacewalk will be moved up to Sunday (April 20).

Why it’s urgent

The U.S. portion of the station has 46 computers, with 24 of them external. The multiplexer/demultiplexer or MDM (one of two) controls 12 of these external computers and is responsible for everything for how the solar arrays are pointed to how some robotics operate. It should be noted here that the primary MDM is working just fine, but if it fails with no backup, there will be problems. NASA will lose telemetry or data from the external ammonia cooling systems operating on station (although the systems themselves will work automatically). Some redundant equipment can’t be turned on, either. The agency also won’t be able to point the solar arrays to get power or to move them aside when spacecraft come in, to protect the arrays from thruster plumes (although further below you can see some backups they have for the array problems.)

NASA astronaut Mike Hopkins during a contingency spacewalk in December 2013 to replace a faulty ammonia pump. Hopkins was part of Expedition 37/38. Credit: NASA
NASA astronaut Mike Hopkins during a contingency spacewalk in December 2013 to replace a faulty ammonia pump. Hopkins was part of Expedition 37/38. Credit: NASA

Fixing the spacesuits

Since last summer’s life-threatening water leak, NASA has been moving quickly to fix the spacesuits it has. All non-urgent spacewalks are off the table until at least this summer while NASA addresses a panel’s recommendations to fix the problem. A faulty fan pump separator was swapped out on the bad suit (Suit 3011) last December, but two spacesuits still needed to be fixed on station. The crew spent much of the past week changing out a fan pump separator on Suit 3005 (which will also be used in the spacewalk) and flushing out the cooling lines in the suit and on station, since contamination is believed to have led to the failure. (More parts will arrive on Dragon, but they won’t be used this time, NASA has determined.)

Spacewalk preps on the ground

Also today, NASA astronaut Chris Cassidy was in “the pool” (at NASA’s Neutral Buoyancy Laboratory) simulating the spacewalk. He’s part of a team working to see what could go wrong on the spacewalk and come up with procedures dealing with that. “As best we can we have all those answers in our hip pockets so as they get thrown out on the game day, we can give the crew a quick answer,” he said in an interview Wednesday (April 16) on NASA TV.

Preparing the new computer

A spare MDM is inside the station, but it was an older model that needed to be reconfigured. Astronauts changed out a processing card and did other hardware/software changes to prepare the MDM to sit outside of the station. They also thoroughly tested it to make sure it’s working before mounting it outside. As a point of interest, no one yet knows why the backup MDM failed, but astronauts will inspect the site for damage (and take pictures). It’s expected that once they bring the broken MDM inside, any failed cards will be swapped out and sent to the ground sometime for analysis. The MDM itself will stay on station to be used again, as needs arise.

SpaceX's Dragon spacecraft berthed to the International Space Station during Expedition 33 in October 2012. Credit: NASA
SpaceX’s Dragon spacecraft berthed to the International Space Station during Expedition 33 in October 2012. Credit: NASA

Grappling Dragon

SpaceX’s Dragon is a cargo spacecraft controlled by the ground, but the astronauts need to be ready to nab it with the robotic Canadarm2 once it arrives (now scheduled for Sunday, April 20). The crew has their normal amount of training and preparation for the procedures, then the time it takes to capture the spacecraft, and then the time to unload the vehicle (which is somewhat urgent as there are certain research experiments that need to come off fairly quickly, NASA said.)

Moving the solar array

NASA not only needs to have the solar arrays out of the way from thruster plumes from Dragon and Progress, but it also needs to keep power to the station and configure the arrays so that if the other MDM fails, the arrays will automatically be placed in a safe spot. The array would autotrack for 24 hours after the MDM fails, then go to a “preset angle” that NASA carefully chose. As for whether there would be power shortages on station, NASA says it depends on the sun’s angle and what needs to be done on station at a particular time.

Moving the Progress spacecraft

Russian cargo ship Progress 53 is supposed to undock from the Zvezda service module on Wednesday (April 23) to test an automated rendezvous system that controls approaches to station. Then it’s docking again on Friday (April 25).

Unless otherwise noted, information in this article is based on comments from the following officials in today’s NASA news conference: Mike Suffredini, International Space Station program manager; Brian Smith, International Space Station flight director and Glenda Brown, lead spacewalk officer.