SpaceX Commercial Rocket Poised for March 1 Blast Off to ISS

SpaceX Falcon 9 rocket before May 2012 blast off from Cape Canaveral Air Force Station, Florida on historic maiden private commercial launch to the ISS. Credit: Ken Kremer/www.kenkremer.com

Kennedy Space Center – All systems are GO and the weather outlook looks spectacular for the March 1 blast off of the privately developed SpaceX Falcon 9 rocket to the International Space Station (ISS).

The Falcon 9 is slated to lift off at 10:10 AM EST with a Dragon capsule loaded with fresh supplies and science gear to continued full up operation and utilization of the ISS.

Right now the weather forecast is at 80% GO on March 1 – with superbly beautiful, clear blue skies here in sunny and comfortably warm Florida from Space Launch Complex 40 at Cape Canaveral Air Force Station.

Large crowds of eager tourists, sightseers and space enthusiasts are already gathering in local hotels – most are sold out including at my hotel where I have been holding well attended ISS star parties during excellent evening viewing opportunities this week.

NASA TV will provide live launch coverage starting at 8 30 AM. SpaceX will also provide a separate feed starting about 40 minutes prior to launch.

The two stage Falcon 9 rocket was rolled out horizontally to the pad late this afternoon (Thursday, Feb. 28) in anticipation of a Friday morning launch. Myself and Dave Dickinson are on-site for Universe Today

The mission dubbed CRS-2 will be only the 2nd commercial resupply mission ever to the ISS.

There are no technical concerns at this time. Saturday March 2 is the back-up launch date in case of a last second scrub. Weather is projected as 80% favorable.

SpaceX President Gwynne Shotwell and NASA officials told me that additional launch opportunities are available Sunday, Monday and Tuesday, if needed, and later until about March 11. After that, the launch team would have to stand down to make way for the next eventual departure of a docked Soyuz and launch of a manned Russian Soyuz capsule with a new three man crew.

SpaceX Falcon 9 rocket liftoff on May 22, 2012 from Space Launch Complex-40 at Cape Canaveral Air Force Station, Fla., on the first commercial mission to the International Space Station.  Credit: Ken Kremer
SpaceX Falcon 9 rocket liftoff on May 22, 2012 from Space Launch Complex-40 at Cape Canaveral Air Force Station, Fla., on the first commercial mission to the International Space Station. Credit: Ken Kremer

The SpaceX Dragon capsule is carrying about 1,200 pounds of vital supplies and research experiments for the six man international crew living aboard the million pound orbiting outpost.

SpaceX is under contract to NASA to deliver over 44,000 pounds of cargo to the ISS during a dozen flights over the next few years at a cost of about $1.6 Billion.

The capsule is fully loaded Shotwell told me. An upgraded Falcon 9 will be used in the next launch that will allow for a significant increase in the cargo up mass, Shotwell elaborated.

The Dragon is due to dock with the ISS in record time some 20 hours after blast off.

Ken Kremer

Private Test Pilots to Fly 1st Commercial Crewed Space Flights for NASA

Dream Chaser from Sierra Nevada docks at ISS

[/caption]

Image Caption: Dream Chaser commercial crew vehicle built by Sierra Nevada Corp docks at ISS

Commercial test pilots, not NASA astronauts, will fly the first crewed missions that NASA hopes will at last restore America’s capability to blast humans to Earth orbit from American soil – perhaps as early as 2015 – which was totally lost following the forced shuttle shutdown.

At a news briefing this week, NASA managers at the Kennedy Space Center (KSC) said the agency is implementing a new way of doing business in human spaceflight and purposely wants private companies to assume the flight risk first with their crews before exposing NASA crews as a revolutionary new flight requirement. Both NASA and the companies strongly emphasized that there will be no shortcuts to flying safe.

A trio of American aerospace firms – Boeing, SpaceX and Sierra Nevada Corp – are leading the charge to develop and launch the new commercially built human-rated spacecraft that will launch Americans to LEO atop American rockets from American bases.

The goal is to ensure the nation has safe, reliable and affordable crew transportation systems for low-Earth orbit (LEO) and International Space Station (ISS) missions around the middle of this decade.

The test launch schedule hinges completely on scarce Federal dollars from NASA for which there is no guarantee in the current tough fiscal environment.

The three companies are working with NASA in a public-private partnership using a combination of NASA seed money and company funds. Each company was awarded contracts under NASA’s Commercial Crew Integrated Capability Initiative, or CCiCap, program, the third in a series of contracts aimed at kick starting the development of the so-called private sector ‘space taxis’ to fly astronauts to and from the ISS.

MTF10-0014-01

Caption: Boeing CST-100 crew vehicle docks at the ISS

The combined value of NASA’s Phase 1 CCiCap contracts is about $1.1 Billion and runs through March 2014 said Ed Mango, NASA’s Commercial Crew Program manager. Phase 2 contract awards will follow and eventually lead to the actual flight units after a down selection to one or more of the companies, depending on NASA’s approved budget.

Since the premature retirement of NASA’s shuttle fleet in 2011, US astronauts have been 100% reliant on the Russians to hitch a ride to the ISS – at a price tag of over $60 Million per seat. This is taking place while American aerospace workers sit on the unemployment line and American expertise and billions of dollars of hi-tech space hardware rots away or sits idly by with each passing day.

Boeing, SpaceX and Sierra Nevada Corp seek to go where no private company has gone before – to low Earth orbit with their private sector manned spacecraft. And representatives from all three told reporters they are all eager to move forward.

All three commercial vehicles – the Boeing CST-100; SpaceX Dragon and Sierra Nevada Dream Chaser – are designed to carry a crew of up to 7 astronauts and remain docked at the ISS for more than 6 months.

“For well over a year now, since Atlantis [flew the last space shuttle mission], the United States of America no longer has the capability to launch people into space. And that’s something that we are not happy about,” said Garrett Reisman, a former space shuttle astronaut who is now the SpaceX Commercial Crew project manager leading their development effort. “We’re very proud to be part of the group that’s going to do something about that and get Americans back into space.”

IMG_3754a_SpaceX launch May 22 2012_Ken Kremer

Caption: Blastoff of SpaceX Cargo Dragon atop Falcon 9 from Cape Canaveral, Florida on May, 22, 2012, bound for the ISS. Credit: Ken Kremer

“We are the emotional successors to the shuttle,” said Mark Sirangelo, Sierra Nevada Corp. vice president and SNC Space Systems chairman. “Our target was to repatriate that industry back to the United States, and that’s what we’re doing.”

Sierra Nevada is developing the winged Dream Chaser, a mini-shuttle that launches atop an Atlas V rocket and lands on a runway like the shuttle. Boeing and SpaceX are building capsules that will launch atop Atlas V and Falcon 9 rockets, respectively, and then land by parachute like the Russian Soyuz capsule.

SpaceX appears to be leading the pack using a man-rated version of their Dragon capsule which has already docked twice to the ISS on critical cargo delivery missions during 2012. From the start, the SpaceX Dragon was built to meet the specification ratings requirements for a human crew.

DragonApproachesStation_640

Caption: Dragon spacecraft approaches the International Space Station on May 25, 2012 for grapple and berthing . Photo: NASA

Reisman said the first manned Dragon test flight with SpaceX test pilots could be launched in mid 2015. A flight to the ISS could take place by late 2015. Leading up to that in April 2014, SpaceX is planning to carry out an unmanned in-flight abort test to simulate and test a worst case scenario “at the worst possible moment.”

Boeing is aiming for an initial three day orbital test flight of their CST-100 capsule during 2016, said John Mulholland, the Boeing Commercial Programs Space Exploration vice president and program manager. Mulholland added that Chris Ferguson, the commander of the final shuttle flight by Atlantis, is leading the flight test effort.

Boeing has leased one of NASA’s Orbiter Processing Facility hangers (OPF-3) at KSC. Mulholland told me that Boeing will ‘cut metal’ soon. “Our first piece of flight design hardware will be delivered to KSC and OPF-3 within 5 months.”

IMG_9198a_Boeing CST_Ken Kremer

Caption: Boeing CST-100 capsule mock-up, interior view. Credit: Ken Kremer

Sierra Nevada plans to start atmospheric drop tests of an engineering test article of the Dream Chaser from a carrier aircraft in the next few months in an autonomous mode. The test article is a full sized vehicle.

“It’s not outfitted for orbital flight; it is outfitted for atmospheric flight tests,” Sirangelo told me. “The best analogy is it’s very similar to what NASA did in the shuttle program with the Enterprise, creating a vehicle that would allow it to do significant flights whose design then would filter into the final vehicle for orbital flight.”

Now to the issue of using commercial space test pilots in place of NASA astronauts on the initial test flights.

At the briefing, Reisman stated, “We were told that because this would be part of the development and prior to final certification that we were not allowed, legally, to use NASA astronauts to be part of that test pilot crew.”

So I asked NASA’s Ed Mango, “Why are NASA astronauts not allowed on the initial commercial test flights?”

Mango replied that NASA wants to implement the model adopted by the military wherein the commercial company assumes the initial risk before handing the airplanes to the government.

“We would like them to get to a point where they’re ready to put their crew on their vehicle at their risk,” said Mango. “And so it changes the dynamic a little bit. Normally under a contract, the contractor comes forward and says he’s ready to go fly but it’s a NASA individual that’s going to sit on the rocket, so it becomes a NASA risk.

“What we did is we flipped it around under iCAP. It’s not what we’re going to do long term under phase two, but we flipped it around under iCAP and said we want to know when you’re ready to fly your crew and put your people at risk. And that then becomes something that we’re able to evaluate.”

“In the end all our partners want to fly safe. They’re not going to take any shortcuts on flying safe,” he elaborated. “All of us have the same initiative and it doesn’t matter who’s sitting on top of the vehicle. It’s a person, and that person needs to fly safely and get back home to their families. That’s the mission of all our folks and our partners – to go back home and see their family.”

Given the nations fiscal difficulties and lack of bipartisan cooperation there is no guarantee that NASA will receive the budget it needs to keep the commercial crew program on track.

Indeed, the Obama Administrations budget request for commercial crew has been repeatedly slashed by the US Congress to only half the request in the past two years. These huge funding cuts have already forced a multi-year delay in the inaugural test flights and increased the time span that the US has no choice but to pay Russia to launch US astronauts to the ISS.

“The budget is going to be an extremely challenging topic, not only for this program but for all NASA programs,” said Phil McAlister, NASA Commercial Spaceflight Development director.

NASA is pursuing a dual track approach in reviving NASA’s human spaceflight program. The much larger Orion crew capsule is simultaneously being developed to launch atop the new SLS super rocket and carry astronauts back to the Moon by 2021 and then farther into deep space to Asteroids and one day hopefully Mars.

Ken Kremer

Dream_Chaser_Atlas_V_Integrated_Launch_Configuration[1]

Caption: Dream Chaser awaits launch atop Atlas V rocket

A Banner Week for Commercial Spaceflight

Dream Chaser on its first captive carry flight. Credit: SNC

[/caption]

While SpaceX stole the headlines with their Dragon spacecraft making the first private cargo run to the International Space Station, they weren’t the only commercial space company to make great strides for the future. “This has been an incredible couple of weeks for the companies in the commercial spaceflight industry,” said former astronaut Michael Lopez-Alegria, who is now president of the Commercial Spaceflight Federation. “Our members are working toward a common goal of opening spaceflight up to the public and expanding NASA’s reach, which will create high-tech jobs in the U.S. while building innovative technology that will improve life on Earth. The SpaceX achieved a historic first, and in just the ten days while they were in orbit, many other companies hit milestones or announced new initiatives.”

For example, on May 29 the Sierra Nevada Corporation completed a milestone for its Dream Chaser program with a captive carry flight test, marking the successful beginning of a flight test program that will continue this summer.

“The successful Captive Carry flight test of the Dream Chaser full scale flight vehicle marks the beginning of SNC’s flight test program; a program that culminates in crewed missions to the International Space Station for NASA,” said former astronaut Steve Lindsey. Lindsey joined SNC in 2011 to run Dream Chaser’s flight operations, and his resume includes service as an Air Force test pilot, a five time Space Shuttle Commander and Pilot, and Chief of NASA’s Astronaut Office.

Captive carry testing provided SNC with an early opportunity to evaluate and prove hardware, facilities and ground operations in preparation for approach and landing tests scheduled for later this year. See a video of the test below:

XCOR Aerospace announced on May 24th that their liquid oxygen piston pump is now ready for reusable spaceflight. XCOR engineers have successfully and repeatedly pumped liquid oxygen at flow rates required to supply the Lynx suborbital vehicle’s main engines, completing a key technical milestone. XCOR is now ready for main propulsion integration into the Lynx flight weight fuselage.

Excalibur Almaz announced on May 27th that it plans to launch spacecraft to space stations they will place in orbit around the moon. Using proven Russian legacy hardware, Excalibur Almaz plans to create a transport system between Earth, low-Earth orbit, and the Moon. EA is now seeking partners, investors, and customers for this next generation space transportation system.

SpaceShipTwo durings its test flight on May 4, 2011. Credit: Clay Observator

Virgin Galactic announced on May 30th that its suborbital spacecraft, SpaceShipTwo, along with its carrier aircraft, WhiteKnightTwo, have been granted an experimental launch permit from the Federal Aviation Administration. This launch permit will allow the vehicle’s manufacturer, Scaled Composites, to continue forward with the flight test program towards rocket-powered test.

Moon Express announced on May 30th that it has acquired Next Giant Leap, LLC in the first team acquisition event of the $30M Google Lunar X PRIZE. The NGL acquisition by Moon Express will leverage and carry forward the substantial work done by NGL and its corporate partners.

Blue Origin announced on May 31st the successful completion of a System Requirements Review of its orbital Space Vehicle on May 15-16 which will help Blue Origin finalize its vehicle design. The review assessed the Space Vehicle’s ability to meet safety and mission requirements, and evaluated the technical readiness of the design, the concept of operations, the feasibility of project development plans, and planned verification activities. The review also included results from recently completed wind tunnel tests of the biconic shape, validating the vehicle’s aerodynamic design, stability and cross-range.

Repaired SpaceX Rocket Set for 2nd Blastoff Try on May 22

SpaceX Falcon 9 rocket poised at Pad 40 on Cape Canaveral Air Force Station for 2nd liftoff attempt on Tuesday, May 22 at 3:44 a.m. after repairs to first stage engine which caused a launch abort on May 19 Credit: Ken Kremer

[/caption]

SpaceX engineers have successfully replaced a faulty valve in a first stage engine that triggered a launch abort on May 19 and that now clears the way for a second launch attempt of the firms Falcon 9 rocket and Dragon spacecraft in the overnight hours early on Tuesday, May 22.

Litfoff of the Falcon 9/Dragon duo on the first private rocket bound for the International Space Station (ISS) is slated for 3:44 AM on May 22 on the historic test flight mision dubbed COTS 2.

“We are ready for blastoff on May 22,” SpaceX spokeswoman Kirstin Grantham told Universe Today during an interview at Space Launch Complex-40 at Cape Canaveral, Florida earlier today as the Falcon 9 rocket was standing erect at the pad under a brilliant blue sky.

“The work to replace a faulty nitrogen engine valve is complete and took just a few hours,” Grantham confirmed to me.

After a thorough inspection of the vehicle and analysis of the repair, the SpaceX team cleared the rocket for launch. The rocket remained vertical during the repair work.

SpaceX engineers at work fixing failed rocket engine valve at Pad 40
A team of SpaceX engineers diligently assessed the cause of the May 19 launch abort for the Falcon 9 rocket poised at Pad 40 on Cape Canaveral Air Force Station. Credit: Ken Kremer/www.kenkremer.com

The weather forecast has improved markedly to an 80% chance of favorable conditions at launch time because the chance of rain showers has decreased. The primary concern is for cumulus clouds.

The launch will be broadcast live on NASA TV and via SpaceX Webcast at http://spacex.com

As on May 19, the launch window is instantaneous meaning SpaceX has just a fraction of a second to get the vehicle off the ground and there is no chance to recycle to a later launch time on the same day.

“The next possibility to launch after May 22 is on May 25,” said Grantham in the event of a scrub on Tuesday. “We could not reserve May 23 due to a conflict with Air Force requirements.”

The two stage Falcon 9 rocket is 157 feet tall. The first stage generates a million pounds of thrust from nine Merlin 1 C engines configured in a 3 by 3 by 3 arrangement.

The May 19 launch was aborted in a split second by the flight computer just 0.5 seconds before liftoff when they detected a slightly high pressure in the combustion chamber of engine number 5 located at the center of the first stage core.

If the launch proceeds as planned, the Dragon will separate from the Falcon 9 second stage some nine minutes after liftoff. Over the next two days, Dragon will close in on the ISS and then perform a series of complicated and stringent rendezvous and abort tests that bring the vehicle to within 1.5 miles and prove it can safely dock at the ISS and pull away in an emergency to prevent any chance of crashing into the ISS.

If NASA is satisfied with the test results, Dragon will be grappled with the robotic arm by US Astronaut Don Pettit and berthed at a port on the ISS on May 25. Astronauts would open the hatch on May 26 and begin unloading the nearly 1200 pounds of cargo consisting of non-critical items such as food, water, clothing and science experiments.

Remote cameras set up to photograph the SpaceX Falcon 9 liftoff from Pad 40 on Cape Canaveral Air Force Station on May 22 at 3:44 a.m. after launch abort on May 19. Credit: Ken Kremer

This is the first third test flight of the Falcon 9 rocket and the first test flight of the Dragon in this vastly upgraded configuration with solar panels.

Only four entities have ever sent a spacecraft to dock at the ISS – the United States, Russia, Japan and the European Union.

If successful, SpaceX will open a new era in spaceflight by giving birth to the first fully commercial mission to the orbiting space station complex and unlock vast new possibilities for its utilization in science and exploration.

SpaceX is under contract with NASA to conduct twelve Falcon 9/Dragon resupply missions to carry about 44,000 pounds of cargo to the ISS for a cost of some $1.6 Billion over the next few years.

The purpose of Dragon is to carry supplies to the ISS and partially replace the cargo capabilities of NASA’s now retired space shuttle. Dragon is a commercial spacecraft designed and developed by SpaceX that will eventually blast astronauts to space.

Ken Kremer

NanoRacks and CASIS Put Research on the Universe’s Front Porch

The International Space Station. Credit: NASA

[/caption]

The Center for the Advancement of Science in Space (CASIS) has opened part of the ISS exterior to research experiments via NanoRacks, a company providing plug-and-play platforms aboard the Station to third-party research organizations. For the first time, commercial experiments will have a dedicated external space aboard the ISS, putting them on “the front porch of the Universe.”

Since 2009 NanoRacks has been providing research institutions with shoebox-sized consoles that can house customized experiments for installation inside the U.S. National Laboratory on board the ISS.

On April 12 CASIS announced a $1.5 million deal with NanoRacks that will allow an external “NanoLabs” platform to be installed on the Japanese Kibo module. The structure will provide research spaces up to 8″ square that will be exposed to the environment of space. (Watch a video of the NanoLabs concept below.)

Through the CASIS investment, as many as four companies will be able to fly experiments for little or no cost.

A formal solicitation to research companies and private enterprises for payload proposals will be issued by CASIS in June. The NanoLabs platform is expected to be ready for flight by 2013 — a full year ahead of schedule.

“CASIS’ investment ensures that U.S. researchers will have access to the ISS External Platform far sooner than otherwise expected,” stated Jeffrey Manber, Managing Director of NanoRacks . “This program will enable faster innovation and spiral development for payloads — an opportunity that has not previously been made available to the commercial marketplace.”

Read the full press release here.

NanoRacks LLC was formed in 2009 to provide quality hardware and services for the U.S. National Laboratory onboard the International Space Station. The company operates the first commercial laboratory in low-earth orbit. The Center for the Advancement of Science in Space (CASIS) was selected by NASA in July 2011 to maximize use of the International Space Station U.S. National Laboratory through 2020. 

Image: S134-E-011413 — A backlit ISS photographed by the STS-134 crew of Endeavour on May 29, 2011, after undocking from the Station. (NASA)

SpaceX’s Dragon, Now With Seating for Seven

Inside the SpaceX Dragon capsule, testing out the seating arrangement for a crew of seven. Test crew included (from top left): NASA Crew Survival Engineering Team Lead Dustin Gohmert, NASA Astronaut Tony Antonelli, NASA Astronaut Lee Archambault, SpaceX Mission Operations Engineer Laura Crabtree, SpaceX Thermal Engineer Brenda Hernandez, NASA Astronaut Rex Walheim, and NASA Astronaut Tim Kopra. Photo: Roger Gilbertson / SpaceX

[/caption]

So much for the idea that space capsules are cramped and can only carry a limited crew. SpaceX revealed a prototype for their new crew cabin design, as they conducted a joint daylong review with NASA of the Dragon crew vehicle layout. In this configuration, the Dragon will be able to carry a crew of seven, the same number the space shuttle could carry. Using a Dragon engineering model equipped with seats and representations of crew systems, they were able to get assessments and feedback from engineers and four NASA astronauts on interior amenities such as lighting, environmental control and life support systems, displays, cargo racks, and the all important seating system. The evaluators participated in human factors assessments which covered entering and exiting Dragon under both regular and emergency (that’s ‘off-nominal’ in NASA-speak) scenarios, as well as reach and visibility evaluations.

See more images from the review, below, along with a video from the initial tests of the SuperDraco engines that will power the launch escape system.

Plus, as a heads-up, SpaceX CEO Elon Musk will be on the US television show “60 Minutes” on Sunday, March 18, 2012. You can see a preview here, (which includes a touching scene of Musk talking about his heroes) and check your local listings here.


NASA Astronaut Rex Walheim, SpaceX CEO and Chief Designer Elon Musk and SpaceX Commercial Crew Development Manager and former NASA Astronaut Garrett Reisman standing inside the Dragon spacecraft during testing activities. Credit: SpaceX.

Even with all seven crewmembers in their seats, there is enough interior space for three additional people to stand and assist the crew with their launch preparations — or for the CEO to kibitz with the crew.

SpaceX and NASA conducted a daylong review of the Dragon crew vehicle layout using the Dragon engineering model equipped with seats and representations of crew systems. Photo: SpaceX

The seven seats mount to strong, lightweight supporting structures attached to the pressure vessel walls. Each seat can hold an adult up to 1.95 meters tall (6 feet 5 inches) and weighing 113 kg (250 lbs), and has a liner that is custom-fit for each crewmember.

Solar Powered Dragon gets Wings for Station Soar

SpaceX Dragon set to dock at International Space Station on COTS 2/3 mission. Falcon 9 launch of Dragon on COTS 2/3 mission is slated for Feb.7, 2012 from pad 40 at Cape Canaveral, Florida. Artist’s rendition of Dragon spacecraft with solar panels fully deployed on orbit. ISS crew will grapple Dragon and berth to ISS docking port. Credit: NASA

[/caption]

The Dragon has grown its mighty wings

SpaceX’s Dragon spacecraft has gotten its wings and is set to soar to the International Space Station (ISS) in about a month. NASA and SpaceX are currently targeting a liftoff on Feb. 7 from Space Launch Complex 40 at Cape Canaveral Air Force Station in Florida.

Dragon is a commercially developed unmanned cargo vessel constructed by SpaceX under a $1.6 Billion contract with NASA. The Dragon spacecraft will launch atop a Falcon 9 booster rocket also built by SpaceX, or Space Exploration Technologies.

Dragon’s solar array panels being installed on Dragon’s trunk at the SpaceX hangar in Cape Canaveral,FL.

The Feb. 7 demonstration flight – dubbed COTS 2/3 – represents the first test of NASA’s new strategy to resupply the ISS with privately developed rockets and cargo carriers under the Commercial Orbital Transportation Services (COTS) initiative.

Following the forced retirement of the Space Shuttle after Atlantis final flight in July 2011, NASA has no choice but to rely on private companies to loft virtually all of the US share of supplies and equipment to the ISS.

The Feb. 7 flight will be the first Dragon mission actually tasked to dock to the ISS and is also the first time that the Dragon will fly with deployable solar arrays. The twin arrays are the primary power source for the Dragon. They will be deployed a few minutes after launch, following Dragon separation from the Falcon 9 second stage.

The solar arrays can generate up to 5000 watts of power on a long term basis to run the sensors and communications systems, drive the heating and cooling systems and recharge the battery pack.

SpaceX designed, developed and manufactured the solar arrays in house with their own team of engineers. As with all space hardware, the arrays have been rigorously tested for hundreds of hours under the utterly harsh conditions that simulate the unforgiving environment of outer space, including thermal, vacuum, vibration, structural and electrical testing.

SpaceX engineers conducting an early solar panel test. Hundreds of flood lamps simulate the unfiltered light of the sun. Photo: Roger Gilbertson/ SpaceX

The two arrays were then shipped to Florida and have been attached to the side of the Dragon’s bottom trunk at SpaceX’s Cape Canaveral launch processing facilities. They are housed behind protective shielding until commanded to deploy in flight.


Video Caption: SpaceX testing of the Dragon solar arrays. Credit: SpaceX

I’ve toured the SpaceX facilities several times and seen the Falcon 9 and Dragon capsule launching on Feb. 7. The young age and enthusiasm of the employees is impressive and quite evident.

NASA recently granted SpaceX the permission to combine the next two COTS demonstration flights into one mission and dock the Dragon at the ISS if all the rendezvous practice activities in the vicinity of the ISS are completed flawlessly.

Dragon with the protective fairings installed over the folded solar arrays, at the SpaceX

The ISS crew is eagerly anticipating the arrival of Dragon, for whch they have long trained.

“We’re very excited about it,” said ISS Commander Dan Burbank in a televised interview from on board the ISS earlier this week.

The ISS crew will grapple the Dragon with the station’s robotic arm when it comes within reach and berth it to the Earth-facing port of the Harmony node.

“From the standpoint of a pilot it is a fun, interesting, very dynamic activity and we are very much looking forward to it,” Burbank said. “It is the start of a new era, having commercial vehicles that come to Station.”

Burbank is a US astronaut and captured stunning images of Comet Lovejoy from the ISS just before Christmas, collected here.

Read recent features about the ISS and commercial spaceflight by Ken Kremer here:
Dazzling Photos of the International Space Station Crossing the Moon!
Absolutely Spectacular Photos of Comet Lovejoy from the Space Station
NASA announces Feb. 7 launch for 1st SpaceX Docking to ISS

Jan 11: Free Lecture by Ken at the Franklin Institute, Philadelphia, PA at 8 PM for the Rittenhouse Astronomical Society. Topic: Mars & Vesta in 3 D – Plus Search for Life & GRAIL

Space Adventures Wants to Fly You to the Moon

Apollo 8's famous Earthrise picture. Would you like to have this view? Credit: NASA

[/caption]

Space Adventures – the company that brought the first space tourists to the International Space Station – has longer space tourist excursions planned for as early as 2015: a trip around the Moon. Company chairman Eric Anderson said during a teleconference they have sold the first of the two seats on their circumlunar flight program, and once the second seat is sold and finalized they could fly the first private mission to the Moon in 4 years.

How will the commercial lunar tour work?

Space Adventures' commercial Moon shot. Credit: Space Adventures.

The tourists would launch on a Soyuz to Earth orbit and dock to the ISS, where they would stay for 8-10 days. A separate rocket, likely a Proton, would launch an upper stage engine and an additional habitation for the Soyuz to add more volume for the 7 day round-trip translunar flight. Soyuz would undock from the ISS and docks with the upper stage and hab module. It would take 3 ½ days to reach the Moon, swing around the far side, with the Soyuz bringing passengers to within 100 km of the Moon’s surface. The tourists will see the Earth from a distance, just as the Apollo astronauts did.

It will take another 3 ½ days to return, with a direct entry into Earth’s atmosphere with the Soyuz.

“This is another watershed event for private spaceflight” Anderson said, “extraordinarily usual moment in history where next human mission to the Moon may be commercial and not government sponsored. A very exciting thing.”

The beauty of the plan, according to Anderson is that no new technology is required, and no new reprogramming of systems, or improvements to heat shield and other systems is required.

Soyuz lunar vehicle. Credit: Space Adventures.

“We’ve planned a mission now that I think is quite suitable” said Richard Garriott, who went to the ISS with Space Adventures, “with a high degree of comfort and reliability.” Garriot added that the hab module will provide an extraordinary comfortable trip to the moon and back, with more room than Apollo.

The price? $100 to $150 million.

Anderson said there will be a test flight, either manned or unmanned before the first tourists go, adding that this mission will fulfill the destiny of humanity to explore the universe.

For more information see Space Adventures.

SpaceShipTwo Successfully Tests “Feathered” Flight

SpaceShipTwo durings its test flight on May 4, 2011. Suborbital science experiments fly aboard this craft, as well as on Blue Origin's New Shepard, and other suborbital flights, providing scientists, students, and others with valuable microgravity access. Credit: Virgin Galactic Credit: Clay Observator

[/caption]

Virgin Galactic’s SpaceShipTwo achieved a major milestone early Wednesday 4th May 2011, as it successfully demonstrated its unique reentry ‘feather’ configuration for the first time. This test flight, the third in less than two weeks, brings powered test flights and — ultimately — commercial operations a step closer.

SpaceShipTwo on the runway after returning from its successful test flight. Credit: Tiffany Titus

SpaceShipTwo (SS2), named VSS Enterprise, went airborne attached to WhiteKnightTwo (WK2) carrier aircraft, VMS Eve at 6:43AM PDT at the Mojave Air and Spaceport in California. After a 45 minute climb to 51,500 feet, SS2 was released from VMS Eve and established a stable glide profile before deploying, for the first time, its re-entry or “feathered” configuration by rotating the tail section of the vehicle upwards to a 65 degree angle to the fuselage. It remained in this configuration with the vehicle’s body at a level pitch for approximately 1 minute and 15 seconds while descending, almost vertically, at around 15,500 feet per minute, slowed by the powerful shuttlecock-like drag created by the raised tail section. At around 33,500 feet the pilots reconfigured the spaceship to its normal glide mode and executed a smooth runway touchdown, approximately 11 minutes and 5 seconds after its release from VMS Eve.

WhiteKnightTwo and SpaceShipTwo in flight after separation. Credit: Tiffany Titus.

Virgin Galactic says all objectives for the flight were met and detailed flight data is now being analyzed by the engineers at Scaled Composites, designers and builders of Virgin Galactic’s sub-orbital spacecraft.

“This morning’s spectacular flight by VSS Enterprise was its third in 12 days, reinforcing the fast turnaround and frequent flight-rate potential of Virgin Galactic’s new vehicles,” said George Whitesides, CEO and President of Virgin Galactic. “ We have also shown this morning that the unique feathering re-entry mechanism, probably the single most important safety innovation within the whole system, works perfectly. This is yet another important milestone successfully passed for Virgin Galactic, and brings us ever closer to the start of commercial operations. Credit is due to the whole Scaled team, whose meticulous planning and great skill are changing the course of history.”

“In all test flight programs, after the training, planning and rehearsing, there comes the moment when you have to go up there and fly it for real,” said Pete Siebold, who along with Clint Nichols piloted SS2. “This morning’s flight was a test pilot’s dream. The spaceship is a joy to fly and the feathered descent portion added a new, unusual but wonderful dynamic to the ride. The fact that it all went to plan, that there were no surprises and that we brought VSS Enterprise back to Mojave safe and sound is a great testament to the whole team.”

For more information see the Virgin Galactic website.

Many thanks to Tiffany Titus for allowing Universe Today to post her images of today’s test flight. You can see more of her images from the flight on her Facebook page.

NASA Funds Experimental “Near Space” Vehicles

Armadillo Aerospace's SuperMod vehicle. Credit: William Pomerantz, Google Lunar X PRIZE

[/caption]

Commercial space companies Armadillo Aerospace and Masten Space Systems have been awarded a total of $475,000 to perform test flights of their experimental vehicles near the edge of space. The award is part of NASA’s Commercial Reusable Suborbital Research Program (CRuSR), which seeks to develop commercial reusable transportation to near space for frequent, low-cost trips to near-space for small payloads.

“These two awards are just the beginning of an innovative teaming relationship with industry to provide affordable access to the edge of space while evaluating the microgravity environment for future science and technology experiments,” said NASA Chief Technologist Bobby Braun. “CRuSR represents the sort of government-commercial partnership that will facilitate near-space access at affordable costs.”

The CRuSR awards will fund two flights this fall and one this winter of Armadillo’s Super-Mod vehicle from Spaceport America in New Mexico. The first two flights will be to an altitude of approximately nine miles and the third to approximately 25 miles.

The Masten Space Systems’ Xaero vehicle (a re-aligned version of their Xoie vehicle for better aerodynamics, according to Colin Ake from Masten) will make four flights this winter from the Mojave Spaceport in California. Two flights will reach an altitude of approximately three miles and two others will be to approximately 18 miles, with an engine shutdown during flight.

Near-space is the region of Earth’s atmosphere between 20,000 and 107,000 meters (65,000 and 350,000 feet).

NASA’s proposed budget for FY 2011 has funds for the CRuSR program that will both go to universities and other research institutions to build science and education payloads, as well as being used to purchase flights on commercial suborbital vehicles. However, the total amount available for the program is yet to be determined by Congress.

Source: NASA