Shuttle Discovery Rolls Back to Vehicle Assembly Building

Space shuttle Discovery waits to roll back from Launch Pad 39A to the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida in the early morning hours of Dec 21, 2010, with the beginning of the total lunar eclipse clearly in view. Credit: NASA/Kim Shiflett

[/caption]

Overnight, space shuttle discovery left launch pad 39A and was rolled back to the Vehicle Assembly Building. There, engineers can use digital X-ray equipment to look at the external fuel tank and attempt to determine what caused the tops of two, 21-foot-long support beams, called stringers, on the outside of the intertank to crack during fueling on Nov. 5. Additionally, foam will be reapplied where 89 sensors were installed on the tank’s aluminum skin for an instrumented tanking test on Dec. 17. The sensors were used to measure changes in the tank last week as super-cold propellants were pumped in and drained out.

This rollback of Discovery was her sixth, and the 20th rollback in the space shuttle program. If everything checks out in the VAB, Discovery is slated to return to the launchpad around January 14, 2011. Discovery’s next launch opportunity is no earlier than Feb. 3.

Engineers also hope to verify their hypothesis that the stinger cracks occurred during cryogenic fueling because of unusual “stresses” on the support beams that took place during the tank’s construction.

And we’ve said it before: never say “last” when it comes to the space shuttle! Discovery’s “last” rollout to the pad was three months ago. And as Peter King from CBS news said on Twitter, not only do we get another rollout, we also get another “last” night launch if the date of February 3 holds. The original “last night shuttle launch” was the February 2010 launch of Endeavour, which I attended, but then the subsequent launch of Discovery in April ended up being a night launch because of delays. Looks likely we’ll have at least one more night launch that turns night into day at KSC.

Breaking News: Space Shuttle Discovery to Be Rolled Back from Launchpad

Discovery on the launchpad. Credit: Alan Walters (awaltersphoto.com) for Universe Today

[/caption]

NASA managers made the decision on Monday afternoon that space shuttle Discovery will be rolled back from the launchpad for inspections and/or repairs. There’s no word from NASA yet on the reason for the decision, but presumably it has to do with the cracks on the “stringers,” or structural ribs of the shuttle’s external tank. A tanking test was scheduled for today (Monday), but cold weather has delayed the test to no earlier than Dec. 17. According to reports on Twitter, the rollback will be done about five days after the tanking test.

The reason for the tanking test delay is that the sensors used to test the external tank won’t bond to the sides of the tank if temperatures are too low, and the current frigid conditions aren’t even close to being warm enough.

Additional word is that the shuttle is hoped to be returned to the launchpad by the middle of January in order to be ready for an anticipated launch in February. But that all depends on the nature of the work NASA engineers determine needs to be done. Since production of external tanks is now finished at the assembly facility in Louisiana, it would take at least two years — and probably more — for a new tank to be built.

More details have now emerged on the reasons for sending Discovery back to the Vehicle Assembly Building:

There, the engineers have better tools and better access to put the external tank through additional image scans. Once in the VAB, technicians would collect X-ray data on stringers on the back side of the external tank midsection, called the intertank, which is not accessible at the launch pad.

Additionally, the test instrumentation and foam insulation on those areas of the intertank would be removed and the area would be prepped again for launch.

Incredible Engineering Camera Views of the Space Shuttle in Action

This video is long, but totally worth the time to watch. Whenever there is any issue with the space shuttle, you’ll hear talk about the engineering camera footage that NASA can look at to review with a fine-tooth comb everything that took place during launch and ascent. Here is a look at some of that footage — in high resolution, and in super slow-motion — to provide a glimpse of the intricate details engineers look for. There’s narration, too, to inform you of everything you’re seeing. It’s great.

From the description:
Continue reading “Incredible Engineering Camera Views of the Space Shuttle in Action”

Shuttle Launch Delayed to February of 2011

Discovery on the launchpad. Credit: Alan Walters (awaltersphoto.com) for Universe Today

[/caption]

NASA announced today that the launch of space shuttle Discovery for the STS-133 mission has been pushed back to no earlier than Feb. 3, 2011, to allow for more testing on the external tank stringers. Cracks on the stringers were found after the tank was loaded with cryogenic fuel for a subsequently scrubbed launch attempt in November.

“We’ve hit a point where there is no obvious answer for what has occurred,” said shuttle program manger John Shannon at a press briefing today, “so we have to take the next step and understand to very fine level the stress on the stringers and to find if that is a root cause of what happened to the STS-133 tank. I need to better understand the conditions to fly that fly tank confidently. It’s unfortunate we are not making the December launch window. But we want to make sure that we do this exactly right.”

The cracks appeared on two 21-foot-long, U-shaped aluminum brackets, called stringers, on the shuttle’s external tank. NASA repaired the cracks and reapplied foam to the exterior of the stringers. But they don’t understand the reasons the cracks appeared, and NASA managers feel this is likely a unique event.

“We don’t have any data that we have been flying with cracks all along,” said Shannon.

The launch window is open from Feb. 3 -10. This delay also moves the STS-134 launch from February to April.
This delay, however, doesn’t mean there won’t be any activity at the International Space Station. The crew for Expedition 26 launches on the Soyuz on Dec. 15, Japan’s HTV supply ship launches on January 20, a Progress resupply ship docks on Jan. 31, and ESA’s ATV resupply vehicle is scheduled for a February 15th launch.

NASA’s Bill Gerstenmaier said the teams will try to replicate what engineers think is the most leading cause is of the failure. “They will build up a stringer panel and put some defects in, the manufactured tolerances, and try to replicate the crack we saw during cryo loadings,” he said. “We’ll also do a test at cape where we load tank with cryogenic propellant and put some devices on the tank to monitor how it loads up and that will serve to validate the math models and the environment we see during loading.”

Gerstenmaier added that between those two tests, they should be able to understand what caused the cracks, but there is now way they can do those tests before December 17, the data NASA had been shooting for to launch STS-133.

“The teams have done tremendous job, but it’s time to pursue a different path,” he said. He also provided a quote from former NASA pioneer Hugh Dryden, who said the purpose of tests is to separate real from imaged problems and to reveal overlooked and unintended problems.

Shuttle Launch Could Be Delayed Into Next Year

Shuttle Discovery on the launchpad. Credit: Alan Walters (awaltersphoto.com) for Universe Today.

[/caption]

While NASA managers have targeted space shuttle Discovery’s launch for no earlier than Dec. 17, they also said they don’t want to rush to any conclusions on the cracks found on the shuttle’s external tank. Therefore, shuttle program manager John Shannon said that if the team doesn’t completely understand the issues, they won’t launch until they do. That might mean mid-December, or it might mean they wait for the next launch window, which is in February of 2011 — or even later.

“It’s a complex problem,” said Shannon. “We really need to understand our risk. Clearly we’re not ready for the December 3 -7 window that’s coming up.”

“We are methodically looking at the data and we’ll let data the drive where we’re heading, drive when we launch,” said Bill Gerstenmaier, NASA’s Associate Administrator for Space Operations, speaking at a press briefing on Wednesday.

Engineering evaluations are ongoing of the four cracks on found on two 21-foot-long, U-shaped aluminum brackets called stringers on the shuttle’s external tank, and Shannon said they still need more analysis until they understand everything. The only previous time cracks like this have been seen are during the assembly process, or if the tank has been mishandled during assembly – cracks like this have never been seen at the launchpad before.

“We have worked hard to understand the exposure, and we want to understand everything,” Shannon said. “We’re looking at the fault tree from assembly, to how it gets foamed, to transport, to how it gets to KSC – every single part of that tank’s life is part of our fault tree analysis.”

It appears the biggest worry is not that the tank would fall apart during the stresses of launch, but that foam would be dislodged from the tank, which could impact the shuttle during launch. Foam from the ET is what damaged space shuttle Columbia, and caused it to disintegrate during reentry in 2003, killing all seven astronauts on board.

If the teams feel their analysis is complete and they have the flight rationale to fly, the earliest launch date would be Friday, Dec. 17 at 8:51:53 pm EST.

A Soyuz is scheduled to dock at the space station at 3 pm EST that day, carrying three new crew members to the ISS.

No launch dates are available in January 2011 because of constraints with the orbit of the space station and conflicts with other unmanned cargo launches. The launch window in February opens on the 27th and closes March 6. Another window, Feb. 3 -10 could be available if the Japanese cargo ship, scheduled to arrive in late January, can be moved to another port on the space station.

We’ll keep you posted.

Stubborn Shuttle Discovery Refuses to Launch on Final Mission

Shuttle Discovery still on the launchpad. Credit: Alan Walters (awaltersphoto.com) for Universe Today.

[/caption]

UPDATE: The launch has now been delayed until Nov. 30, as a crack was found in the foam on Discovery’s external tank after the fuel was offloaded this morning. Engineers posting on Twitter said the hydrogen leak this morning may have been a lucky break, as the crack had ice underneath and may have easily come off during launch. The crack was not seen previously.

It seems as through space shuttle Discovery keeps coming up with excuses to delay the launch of her final mission to space, and the launch pad facilities and weather are conspiring along with her. Originally scheduled to launch on Nov. 1, this latest delay comes from a hydrogen leak in a vent arm attached to the shuttle’s external tank. The work required will push back any further launch attempt until at least Monday, Nov. 8. That is the last day available in the current launch window, and if it doesn’t launch then the window closes until Nov. 30, due to unfavorable sun angles for when the shuttle would be docked to ISS.

This is not the first time a leak has occurred in the vent arm, but this time the leak was “substantial” said Launch Director Mike Leinbach.

“The signature of the leak is similar to what we’ve seen in the past when we’ve had leaks there, although the magnitude was higher this time and it occurred earlier in our tanking process,” he said.

Discovery’s 11-day mission to the International Space Station will bring a new storage module and the first humanoid robot, Robonaut 2, or R2 to the station. The Nov. 8 launch time is now scheduled for 12:53 Eastern STANDARD Time (17:53 UT).

Previous delays have stemmed from leaks in different systems, an electrical glitch and rainy, windy weather.

The launch scrubs have disappointed participants of the launch Tweet-up, where NASA allows Twitterers a chance to view a launch from Kennedy Space Center. While some of the participants are waiting out the delays, most have had to return home. This marks the first time there has been a launch delay when NASA has held a Tweet-up for a shuttle liftoff.

If you are needing to see a launch, try keeping an eye on a Delta II rocket launch from Vandenberg Air Force Base in California, with the COSMO Earth observing satellite. This rocket, too has had its share of delays, but is now slated for launch on Friday, Nov. 5 at 10:20 pm EDT (7:20 pm PDT).

Can’t Get to Kennedy Space Center? See Launchpad Up Close in Gigapan

Screenshot from the Gigapan image of space shuttle Discovery on the launchpad.

[/caption]

From experience, I can tell you being at one of the launchpads at Kennedy Space Center is awesome beyond words. Not many people, though, get to see a shuttle on the launchpad up close and personal, and with just a couple launches left, many are at least are hoping to get a view of the launch. But if you aren’t able to travel to Florida and see a shuttle on the pad, you can take advantage of a few different websites that can take you there virtually, and probably bring you closer than you could ever get in person.

The first website is Gigapan, where NASA photographer Bill Ingalls has put together all the high resolution images he took on Sunday, Oct. 31, 2010 at Kennedy Space Center, and created one huge images that you can pan around and see everything up close. Go to the Gigapan website, and by moving your mouse around or by clicking on the images below the big image, you will be transported up close and personal with various locations within the image.

The Gigapan technology was originally developed for the Mars Exploration Rovers, and the panoramas created from Mars enabled a simulated experience of being on another planet. The Gigapan project aims to create a similar experience, but for exploration of Earth.

The second website is John O’Connor’s NASA Tech website. I met John when I was at Kennedy Space Center earlier this year, was able to watch him take the images for the extremely high resolution virtual tours he creates. The interactive 360 degree images he creates are nothing short of stunning — but they are also very bandwidth intensive — so be prepared, and watch out if you don’t have high speed internet or have a lot of browsers or windows open on your computer. Right now on his website you can see different views of the launchpad with Discovery sitting on top, and also go inside the space station processing facility and see Robonaut 2 before he was stowed for launch on STS-133, and much more.

Here’s an image I took of John setting up his equipment when we were at Launchpad 39B in March of this year.

John O'Connor from NASA Tech.

Shuttle Launch Delayed at Least One Day

Space Vehicle
Space Shuttle Discovery

[/caption]

Second Update (10/30): Launch of space shuttle Discovery is now targeted for Wednesday, Nov. 3 at 3:52p EDT. Technicians are still working to make repairs on the OMS engine.

The launch of space shuttle Discovery for the STS-133 mission has been pushed back at least one day due to the discovery of leaks in the right hand Orbital Maneuvering System Pod. Therefore, the launch will occur no sooner than Tuesday, Nov. 2 (and that has now been pushed to Nov. 3) . Managers, engineers and technicians are evaluating helium and nitrogen leaks in the pressurization portion of the OMS pod. The leaks must be fixed before launch and the decision was made to delay at least a day. Countdown had been scheduled to begin at 3 p.m. EDT today (Friday) but could begin on Saturday at 2 p.m. if the leak situation is resolved soon. The launch window on Tuesday, November 2 would open at 4:17 p.m. Wednesday, Nov. 3 at 3:52p EDT. NASA will be holding a press conference at 10 am EDT (watch on NASA TV), and we’ll provide an update after the conference. (See update below)

These leaking helium and nitrogen seals are unrelated to the fuel leak that was repaired last week, also related to Discovery’s right OMS pod.

In other shuttle news, there are some political rumblings that the additional shuttle mission — among other things — that was part of the newly signed outline for NASA’s budget could be under threat of being cut. Some politicians are looking at cutting NASA’s budget in order to save money, and the $300 million uptick for NASA is one target. For more information, check out this article in the Orlando Sentinel.

UPDATE: During the press conference Friday morning, launch test director Jeff Spaulding said this type of repair has been done several times previously on the launch pad, so they are not very worried about this causing a big delay. They do have to re-pressurize the various tanks, which require a pad clear (getting all personnel away from the launch pad), so that causes some delay in that they can’t proceed with the normal countdown activities.

As of right now, they are assuming they can launch on Tuesday because it is a rather routine repair. The teams did work overnight on removing the seals where the leak was found. “The standard process is to remove and inspect both sides of the connector to look at the problem of what caused the leak,” Spaulding said. “Sometimes the seals reseat themselves just by taking them apart and putting it back together, but the team did see contamination — a seal was in the wrong place. They did get it to lock up when they reconnected it, but they weren’t really comfortable with it knowing there was possibly some contamination.”
So today, the teams will likely replace the connectors.

STS-133 is an 11 day mission to the ISS, which is bringing up supplies, and the new permanent logistics module (basically a store room) and the humanoid robot Robonaut 2. (R2).

NASA is expect a huge crowd for the launch, as this is Discovery’s final mission. There’s also an air show in the area this weekend, so many people are planning to attend both the show and the launch. But that is not a factor in making the decision to launch, Spaulding said. “We are happy to have the teams that handle these kinds of repairs, and we will fly this vehicle only when it is ready to go.”

Another item of note is that Nov. 2 is Election Day here in the US, so NASA has encouraged their employees to do early voting in case the launch is on Tuesday and employees would then likely not have the time to vote.

As far as weather, Weather Director Kathy Winters said on Tussday there is a small concern about some rain coming into the area, and right now there would be a 30% chance of weather prohibiting launch on Tuesday.

Former Shuttle Astronaut Reflects on Discovery’s Final Mission

Discovery returns to Earth with the crew of STS-29. Robert Springer was a member of this crew and recently sat down and gave his thoughts about the end of the shuttle era. Photo Credit: NASA

[/caption]

As he looks back over the years, former shuttle astronaut Robert Springer remembers the shuttle era very clearly. He flew on Atlantis – and Discovery. With the final flight of Discovery only a few days away, he took time out of his busy schedule to reminisce about his time ‘riding rockets.’

“Great memories,” Springer said, “I’m really proud of the opportunity I had and the chance to serve my country, and so it was was special — very special.”

Springer received his aviator’s wings in 1966 with the United States Marine Corps. He flew F-4 Phantoms in Vietnam where he also served as an advisor to the South Korean Marine Corps. Springer would fly some 300 combat missions in F-4s and an additional 250 combat missions in O-1 Bird Dogs, UH-1 “Hueys.” Springer would eventually attend navy Fighter Weapons School – known more commonly as “TOPGUN.” Springer has been awarded numerous awards including the Navy Distinguished Flying Cross and the Bronze Star.

He was selected to become an astronaut in 1980, completing training one a year later in 1981. He served on the support crew for STS-3 working on various aspects of the “Canadarm” remote manipulator system. Between 1984 and 1985 he served as CAPCOM on seven shuttle flights. After waiting nine years he flew his first mission in 1989 aboard Discovery on STS-29.

Crew portrait with Springer in the middle of the top row. Image Credit: NASA

STS-29 was a highly-successful mission that deployed a Tracking and Data Relay Satellite (TDRS) and conducted numerous experiments while on orbit. A year later in 1990 Springer again left Earth for the black sky on STS-38. This mission was aboard Atlantis and was a classified Department of Defense mission. It was the first mission to land at Kennedy Space Center in Florida since 1985. Of the two missions, Springer remembers STS-38 with a bit of a smile.

“My first flight on STS-29 was shortly after the first Return-to-Flight in 1988 and while the media attention was nice, once is enough,” Springer said. “So for STS-38 we were completely cut off from the press – it was fantastic! I just felt kind of bad for the new guys on that flight as they missed that aspect of a shuttle mission.”

When speaking with Springer, you can see the smile fade somewhat when the subject turns to the final flight of Discovery, arguably the most historic of the surviving orbiters.

“It’s going to be a little tough, realizing that this will be the last time that Discovery will be going into space,” Springer said while looking out at Launch Complex 39a. “You know that someday that the program is going to come to an end, but to actually have that take place and come to fruition, while exciting to see it launch – it will be sad.”

He fondly recollected his experience on board Discovery as one of the most amazing experiences in a career that has witnessed some of the most powerful experiences in American history.

“The flight overall was fantastic, it was so incredibly intense,” Springer said with a smile. “We were one of the first flights after the Challenger accident. While we normally plan for a 16 hour day during missions, we were so busy it ended up being an 18 hour day. Whenever we had a free minute we would hog the windows and stare out into space until you couldn’t fight it anymore and you’d drift off to sleep – and around the shuttle cabin.”

Soyuz Launches; Discovery’s Final Payload Delivered to Launch Pad

In the left of this image the payload canister sits attached to the Rotating Service Structure (RSS) waiting to have STS-133's payload removed. Photo Credit: Universe Today/Jason Rhian

[/caption]

October 7 was a busy day in spaceflight, as a Soyuz launched 2 cosmonauts and 1 astronaut to the International Space Station, and for the last time the payload canister for the space shuttle Discovery made its way to Launch Complex 39A (LC39A) at NASA’s Kennedy Space Center (KSC) in Florida. Crews are now preparing to install the payload into Discovery’s cargo bay on Monday morning, which includes the first humanoid robot to fly into space Robonaut-2 or “R2.”

See below for a video of the Soyuz launch.

Alexander Kaleri, Oleg Skripochka and Scott Kelly are now on their way to join three other crew members aboard the ISS station after a two-day trip on the Soyuz.

For the final flight of Discovery, STS-133, the another payload is the reconfigured Leonardo Multi-Purpose Logistics Module (MPLM) now dubbed the Permanent Multipurpose Module. The mission will also carry the Express Logistics Carrier 4 and much-needed spare parts to the International Space Station (ISS).

The mission is slated to launch no-earlier-than Nov.1 at 4:40 p.m. EDT.

A large white canister is hoisted up and the payload that is sealed inside will be removed. From there the canister is taken away, the Rotating Service Structure (RSS) will swing over the space shuttle and then be loaded into the shuttle’s cargo bay. The entire process takes a little over a week.

STS-133 will mark the final flight of the space shuttle Discovery. Photo Credit: Universe Today/Alan Walters

The crew for STS-133 consists of Commander Steve Lindsey, Pilot Eric Boe and Mission Specialists Nicole Stott, Alvin Drew, Tim Kopra and Michael Barratt.

The crew of STS-133. from left to right, Alvin Drew, Nicole Stott, Eric Boe, Steve Lindsey, Micheal barratt and Tim Kopra. Image Credit: NASA

The canisters that deliver the payload out to the launch pad have been used since the shuttle program’s inception. However, that does not mean that they are destined to go to the Smithsonian or some other world-famous museum. In fact there is no real clear destination for any of these pieces of hardware. As NASA no longer has a clear path forward it is not known whether-or-not the canisters will be used in some future, as-yet-unnamed program.

“They’re pretty old critters, they’ve been with us since the beginning of the shuttle program,” said Scott Higginbotham NASA’s mission manager in charge of payloads. “They’ve delivered all the payloads either to the Orbiter Processing Facility (OPF) for horizontal installation or out here to the pad for vertical installation.”

The payload canister is loaded onto the RSS in preparation for loading into Space Shuttle Discovery for STS-133. Image is an HDR composite from five images. Credit: Alan Walters (awaltersphoto.com) for Universe Today.